Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-103-05795MCLAUGHLIN, A C
42
SCOUT ENERGY MANAGEMENT LLC
10779
AC
5/1/2023
RANGELY
72370
RIO BLANCO  103
NWSE 13 2N103W 6
314477View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (04 )
402473761
10/27/2020
1) This approval is good for one year and a new application must be made before 1/09/2021 (1 year from prior application). Updates for the planned utilization of the well should be included with the application. 2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request. 3) A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
EngineerForm: (04 )
402548232
2/24/2021
1) This approval is good for one year and a new application must be made before 01/09/2022 (1 year from prior application). Updates for the planned utilization of the well should be included with the application. 2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request. 3) A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
EngineerForm: (04 )
402705000
6/21/2021
1) This sundry to conduct bradenhead diagnostic evaluations is valid until 6/1/2022 2) For Wells that have sustained casing pressure above the action threshold as determined through diagnostic testing and evaluation, the Operator will provide a PMP with the Form 4, including a description of the Operator’s findings from the previous year, number of times the well was blown down, a current WBD and future plans for more frequent monitoring or testing, pressure mitigation, or remedial well work by 6/1/2022 3) Submit the gas sample analysis from previous Form 17 bradenhead test on a Form 43 4) Comply with any CDPHE, Air Pollution Control Division rules or requirements for all atmospheric discharges.
EngineerForm: (04 )
402909439
2/7/2022
1) This approval is good for one year and a new application must be made before 01/09/2023 (1 year from prior application). Updates for the planned utilization of the well should be included with the application. 2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request. Submit all missing reporting for 1/2021 forward.
 
COGIS - Best Management Practice Results
No records to display.