Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-103-05708M.B. LARSON C
3
SCOUT ENERGY MANAGEMENT LLC
10779
IJ
8/1/2025
RANGELY
72370
RIO BLANCO  103
NWSE 22 2N103W 6
314442View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (04)
403915073
09/16/2024
Operator submission of sundry per MOU 2021, 2022, 2023 Annual BH Test completed
EngineerForm: (04)
404290296
07/29/2025
1) For applicable operations, report work completed within 30 days on a Form 4 Sundry REPORT OF WORK DONE - Repair Well noting final pressure test results and include any operational or job summaries. If the wellbore geometry changes or there is not an updated WBD in the well file submit an updated WBD. 2) For applicable operations, submit a Form 5 or 5A (updated packer and tubing depths) within 30 days of the work with job related documents including a minimum of one of the following attachments: operations summary, cement job summary and/or wireline summary. Additionally, include CBL’s and any additional logs run. 3) Complete a Form 21 MIT to verify repairs for injection wells. MIT is required to be approved prior to returning well to injection 4) Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations 5) Operator shall notify ECMC Engineering staff prior to pumping cement or if changes to the approved repair procedure are required.
 
COGIS - Best Management Practice Results
No records to display.