| Engineer | Form: (04) 401521608 05/21/2018 | This approval is good for one year and a new application must be made before January 22, 2019(1 year from prior application). Updates for the planned utilization of the well should be included with the application.
A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
The Form 7 reporting must reflect the well status dates reported on the TA request. |
| Engineer | Form: (04) 401873164 04/22/2019 | This approval is good for one year and a new application must be made before January 22, 2020(1 year from prior application). Updates for the planned utilization of the well should be included with the application.
A Form 5A is required to report all plugs currently downhole which isolate the perforated interval. |
| Engineer | Form: (04) 402269622 03/30/2020 | 1) This approval is good for one year and a new application must be made before 1/9/2021(1 year from prior application). Updates for the planned utilization of the well should be included with the application.
2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
3) A Form 5A is required to report all plugs currently downhole which isolate the perforated interval. |
| Engineer | Form: (04) 402551597 04/19/2021 | 1) This approval is good for one year and a new application must be made before 01/09/2022 (1 year from prior application). Updates for the planned utilization of the well should be included with the application.
2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
|
| Engineer | Form: (04) 402905146 01/27/2022 | 1) This approval is good for one year and a new application must be made before 01/09/2023 (1 year from prior application). Updates for the planned utilization of the well should be included with the application.
2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
3) Submit a Wellbore Diagram on a Form 4 Sundry
|
| Engineer | Form: (04) 403210333 03/01/2023 | Updated well classification to Observation Well. Used 11/04/2022 as date well is no longer an injector. Operator to report this well as AC (Active) on Form 7. |
| Engineer | Form: (04) 403844044 07/09/2024 | 1) For applicable operations , report work completed with a Form 4 Sundry REPORT OF WORK DONE - Repair Well noting final pressure test results and include any operational or job summaries. If the wellbore geometry changes or there is not an updated WBD in the well file submit an updated WBD.
2) For applicable operations, submit a Form 5A or 5 within 30 days of the work with job related documents including a minimum of one of the following attachments: operations summary, cement job summary and/or wireline summary. Additionally, include CBL’s and any additional logs run.
3) Complete a Form 21 MIT to verify repairs for injection wells
|
| UIC | Form: (04) 403844044 07/11/2024 | Operator shall provide cement bond logs over liner and 7 inch casing string. Provide cement bond log and all other logs run with Form 4 Sundry REPORT OF WORK DONE. |
| UIC | Form: (04) 403844044 07/11/2024 | Packer depth shall be within 100 feet of top perforation. |
| UIC | Form: (04) 403844044 07/11/2024 | Mechanical Integrity Test shall be witnessed before the commencement of injection. Provide at least 10 day notice via Form 42. |
| UIC | Form: (04) 404484763 12/23/2025 | 1) For applicable operations, report work completed within 30 days on a Form 4 Sundry REPORT OF WORK DONE - Repair Well noting final pressure test results and include any operational or job summaries. If the wellbore geometry changes or there is not an updated WBD in the well file submit an updated WBD.
2) For applicable operations, submit a Form 5 or 5A (updated packer and tubing depths) within 30 days of the work with job related documents including a minimum of one of the following attachments: operations summary, cement job summary and/or wireline summary. Additionally, include CBL’s and any additional logs run.
3) Complete a Form 21 MIT to verify repairs for injection wells. MIT is required to be approved prior to returning well to injection
4) Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations
5) Operator shall notify ECMC Engineering staff of changes and/or additional repair methods to the approved repair procedure. |