Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-103-05590EMERALD
8
SCOUT ENERGY MANAGEMENT LLC
10779
IJ
8/4/2022
RANGELY
72370
RIO BLANCO  103
NESE 26 2N103W 6
314390View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02 )
400299269
7/6/2012
IMPLEMENT PUBLIC SAFETY PLAN IF RADIUS OF EXPOSURE IS EQUAL TO OR GREATER THAN 50' READ AND FOLLOW COGCC POLICY FOR REPORTING HYDROGEN SULFIDE-SEE COGCC WEBSITE-MENU-POLICIES-REPORTING HYDROGEN SULFIDE RUN CBL ON SIDETRACK 5" OD PRODUCTION CASING APPROVAL OF THIS FORM IS NOT APPROVAL TO INJECT. APPROVAL OF FORM 33 IS REQUIRED FOR INJECTION. ADHERENCE(S) TO THE FOLLOWING NOTICE TO OPERATORS APPLIES: NW AREA NOTIFICATION PROCEDURES
EngineerForm: (04 )
402631587
3/18/2021
1) Submit Form 4 Sundry: Report of Work Done after completing repairs 2) Rule 417.a.4.C- All Injection Wells. A new mechanical integrity test will be performed after any casing repairs, after resetting the tubing or mechanical isolation device, or whenever the tubing or mechanical isolation devise is moved during workover operations.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Drilling/Completion OperationsForm: (02 )
400299269
7/31/2012
USE EXISTING WELLBORE AND SIDE TRACK AND RECOMPLETE IN WEBER FORMATION.
Material Handling and Spill PreventionForm: (02 )
400299269
7/31/2012
RANGELY WEBER SAND UNIT FULL FIELD SPILL PREVENTION, CONTROL AND COUNTER MEASURE PLAN IN PLACE. STORM WATER PLAN IN PLACE FOR THIS LOCATION.
ConstructionForm: (02 )
400299269
7/31/2012
UTILIZE EXISTING WELL LOCATIONS