Drilling/Completion Operations | Form: (02 ) 400299269 7/31/2012 | USE EXISTING WELLBORE AND SIDE TRACK AND RECOMPLETE IN WEBER FORMATION. |
Material Handling and Spill Prevention | Form: (02 ) 400299269 7/31/2012 | RANGELY WEBER SAND UNIT FULL FIELD SPILL PREVENTION, CONTROL AND COUNTER MEASURE PLAN IN PLACE. STORM WATER PLAN IN PLACE FOR THIS LOCATION. |
Construction | Form: (02 ) 400299269 7/31/2012 | UTILIZE EXISTING WELL LOCATIONS |