COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (04)
401517858
03/22/2018
This approval is good for one year and a new application must be made before January 18, 2019(1 year from prior application). Updates for the planned utilization of the well should be included with the application. A Form 5A is required to report all plugs currently downhole which isolate the perforated interval. The Form 7 reporting must reflect the well status dates reported on the TA request.
EngineerForm: (04)
401517858
03/22/2018
Tubing plug provides downhole isolation. Plug will be pulled periodically in order to measure the reservoir pressure and then reinstalled, maintaining the TA status. Flowline is disconnected.
EngineerForm: (04)
401733542
08/17/2018
This approval is good for one year and a new application must be made before January 18, 2019(1 year from prior application). Updates for the planned utilization of the well should be included with the application.
EngineerForm: (04)
401879027
04/23/2019
This approval is good for one year and a new application must be made before January 18, 2020(1 year from prior application). Updates for the planned utilization of the well should be included with the application.
EngineerForm: (04)
402269638
03/30/2020
1) This approval is good for one year and a new application must be made before 1/09/2021 (1 year from prior application). Updates for the planned utilization of the well should be included with the application. 2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request. 3) A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
EngineerForm: (04)
402551384
04/15/2021
1) This approval is good for one year and a new application must be made before 01/09/2022 (1 year from prior application). Updates for the planned utilization of the well should be included with the application. 2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
EngineerForm: (04)
402903451
01/11/2022
1) This approval is good for one year and a new application must be made before 01/09/2022 (1 year from prior application). Updates for the planned utilization of the well should be included with the application. 2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request. 3) Submit a Wellbore Diagram on a Form 4 Sundry
EngineerForm: (04)
403210186
03/01/2023
Updated well classification to Observation Well. Used 11/04/2022 as date well is no longer an injector. Operator to report this well as AC (Active) on Form 7.
EngineerForm: (02)
404074245
04/21/2025
Submit wellbore formation top depths on Form 5 within 30 days of completing operations
EngineerForm: (02)
404074245
04/21/2025
1) Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations. 2) Submit wellbore formation top depths on Form 5 within 30 days of completing operations 3) Form 7 reporting should reflect updated PR status 4) Operator shall implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard to public welfare.
UICForm: (04)
404522401
01/28/2026
1) For applicable operations, report work completed within 30 days on a Form 4 Sundry REPORT OF WORK DONE - Repair Well noting final pressure test results and include any operational or job summaries. If the wellbore geometry changes or there is not an updated WBD in the well file submit an updated WBD. 2) For applicable operations, submit a Form 5 or 5A (updated packer and tubing depths) within 30 days of the work with job related documents including a minimum of one of the following attachments: operations summary, cement job summary and/or wireline summary. Additionally, include CBL’s and any additional logs run. 3) Complete a Form 21 MIT to verify repairs for injection wells. MIT is required to be approved prior to returning well to injection 4) Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations 5) Operator shall notify ECMC Engineering staff of changes and/or additional repair methods to the approved repair procedure.
 