Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-103-05030PAUL BURTON &
39;A&
39;
1
QB ENERGY OPERATING LLC
10844
PA
6/14/2019
SULPHUR CREEK
80090
RIO BLANCO  103
NESW 27 3S98W 6
314287View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (06)
401869740
12/18/2018
1)Provide 48 hour notice of plugging MIRU via electronic Form 42. 2)Check bradenhead pressure and perform a bradenhead test prior to MIRU if the pressure is greater than 50 psi. Submit results electronically on a Form 17 and contact COGCC Area Engineer. 3)Properly abandon flowlines as per Rule 1105. File electronic Form 42 once abandonment complete. Within 30 days of an operator completing abandonment requirements for an off-location flowline or crude oil transfer line the operator shall submit a Flowline Report, Form 44. 4)This well has federal minerals. Operator shall notify COGCC engineering staff of any plugging changes required by the BLM or unexpected conditions in the field as soon as feasible. 5)Operator shall implement measures to control unnecessary and excessive venting, to protect the health and safety of the public, and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard to public welfare.
 
COGIS - Best Management Practice Results
No records to display.