Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
PIT102655PECK "A" BATTERY
WESTERN OPERATING COMPANY
95620
AC
9/23/1999
REDWING
72900
WASHINGTON  121
SENE 15 1N54W 6
317031View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
Environmental DataForm: (04)
403632468
01/22/2024
Once water production has resumed to the pit, the operator will collect samples for water quality analysis as specified in Rule 909.j. Sample collection will occur within 30 days of recommencement of water production and will be reported within 3 months of collection, as specified in Rule 909.j.(3).
Environmental DataForm: (04)
404420772
12/10/2025
Once water production has resumed from the well to the pit, the operator will collect samples for water quality analysis as specified in Rule 909.j. Sample collection will occur within 30 days of recommencement of water production and will be reported within 3 months of collection, as specified in Rule 909.j.(3).
 
COGIS - Best Management Practice Results
No records to display.