Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-081-07721DEAL GULCH
1-16
GRMR OIL & GAS LLC
10524
SI
1/1/2026
SAND WASH HORIZONTAL NIOBRARA
76400
MOFFAT  081
SWNE 16 5N90W 6
428535View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02)
400254098
03/13/2012
1)COMPLIANCE WITH THE MOST CURRENT REVISION OF THE NORTHWEST COLORADO NOTIFICATION POLICY IS REQUIRED. 2)INTERMEDIATE CASING CEMENT TOP VERIFICATION BY CBL REQUIRED. 3)THE PROPOSED SURFACE CASING IS MORE THAN 50' BELOW THE DEPTH OF THE DEEPEST WATER WELL WITHIN 1MILE OF THE SURFACE LOCATION WHEN CORRECTED FOR ELEVATION DIFFERENCES. THE DEEPEST WATER WELL WITHIN 1 MILE IS 000 FEET DEEP.
EngineerForm: (02)
400254076
03/13/2012
1)COMPLIANCE WITH THE MOST CURRENT REVISION OF THE NORTHWEST COLORADO NOTIFICATION POLICY IS REQUIRED. 2)INTERMEDIATE CASING CEMENT TOP VERIFICATION BY CBL REQUIRED. 3)THE PROPOSED SURFACE CASING IS MORE THAN 50' BELOW THE DEPTH OF THE DEEPEST WATER WELL WITHIN 1MILE OF THE SURFACE LOCATION WHEN CORRECTED FOR ELEVATION DIFFERENCES. THE DEEPEST WATER WELL WITHIN 1 MILE IS 000 FEET DEEP.
EngineerForm: (02)
2170359
08/07/2012
CONDITIONS OF APPROVAL FOR THIS SIDETRACK ARE THE SAME AS THOSE ON THE PERMIT FOR THE ORIGINAL HOLE. DOCUMENT # 400254098
Field InspectorForm: (04)
400529273
02/24/2014
Field inspection to be performed to verify compliance
EngineerForm: (04)
400641609
08/21/2014
1) Comply with all requirements of Rule 912, including monthly reporting of flared volumes (on Form 7) and notifications to local emergency dispatch or the local government designee. 2) Submit annual updates (requests to flare) to COGCC on Form 4’s (Sundry Notices), which discuss whether or not any new gathering systems or increased development of the field have changed pipeline economics such that installation of a new pipeline would be an economically viable option in lieu of continued flaring. 3) Comply with any Colorado Department of Public Health and Environment, Air Pollution Control Division rules or requirements for all atmospheric discharges.
EngineerForm: (04)
401090508
09/12/2016
1) Comply with all requirements of Rule 912, including monthly reporting of flared volumes (on Form 7) and notifications to local emergency dispatch or the local government designee. 2) Submit annual updates (requests to flare) to COGCC on Form 4s (Sundry Notices),including all information specified in COGCC’s "Notice to Operators, Rule 912 Venting or Flaring Produced Natural Gas - Statewide." 3) Comply with any Colorado Department of Public Health and Environment, Air Pollution Control Division rules or requirements for all atmospheric discharges. 4) An enclosed flare shall be used, unless an open flare is specifically allowed by CDPHE’s Regulation 7.
EngineerForm: (04)
401191378
04/13/2017
1) Comply with all requirements of Rule 912, including monthly reporting of flared volumes (on Form 7) and notifications to local emergency dispatch or the local government designee. 2) Submit annual updates (requests to flare) to COGCC on Form 4s (Sundry Notices),including all information specified in COGCC’s "Notice to Operators, Rule 912 Venting or Flaring Produced Natural Gas - Statewide." 3) Comply with any Colorado Department of Public Health and Environment, Air Pollution Control Division rules or requirements for all atmospheric discharges. 4) An enclosed flare shall be used, unless an open flare is specifically allowed by CDPHE’s Regulation 7. 5) With the next annual update (request to flare), collect a new gas analysis and submit an Electronic Data Deliverable (EDD) prepared by the laboratory that performed the gas analysis. The EDD shall be submitted in the format specified on COGCC’s website located in Help => Environmental => COGCC EDD Information.
EngineerForm: (04)
402054479
06/06/2019
1.Flaring of natural gas shall comply with COGCC Rule 912. 2.The unnecessary or excessive venting or flaring of produced natural gas is prohibited. 3.Operator is to provide prior notification to the local emergency dispatch or the local governmental designee of any flaring or venting event. 4.An Operator Monthly Report of Operations, Form 7, requires the reporting of flared, vented or used on the lease gas volumes. The reported volume includes flowback and production gas. 5.The operator is required to obtain and maintain any required air permits from CDPHE. 6. Submit annual updates (requests to flare) to COGCC on Form 4s (Sundry Notices), including all information specified in COGCC’s "Notice to Operators, Rule 912 Venting or Flaring Produced Natural Gas - Statewide." 7.With the next annual update (request to flare), collect a new gas sample for laboratory analysis including hydrogen sulfide and submit a Form 43 to upload the laboratory results to the COGCC Environmental Database. Form 43 instructions are on COGCC’s website under Regulation => Forms => Form 43 COGCC Environmental Database.
EngineerForm: (04)
402805045
10/25/2021
1. Operator shall have an approved Gas Capture Plan or have sought and received a variance from the COGCC Commission for continued production without gas infrastructure, prior to January 15, 2022 or wells must be shut in by January 15, 2022. 2. Flaring of natural gas shall comply with COGCC Rule 903. 3. The unnecessary or excessive venting or flaring of produced natural gas is prohibited. 4. Operator is to provide prior notification to the local emergency dispatch or the local governmental designee of any flaring or venting event. 5. An Operator Monthly Report of Operations, Form 7, requires the reporting of flared, vented or used on the lease gas volumes. The reported volume includes flowback and production gas. 6. The operator is required to obtain and maintain any required air permits from CDPHE.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Storm Water/Erosion ControlForm: (02 )
400254098
4/13/2012
Stormwater Management Plans (SWMP) are in place to comply with both Colorado Department of Public Health and Environment (CDPHE) and Colorado Oil and Gas Conservation Commission (COGCC) stormwater discharge permits. The construction layout for Deal Gulch 1-16 details Best Management Practices (BMPs) to be installed during initial construction. Note that BMPs may be removed, altered, or replaced with changing conditions in the field and the SWMP will be updated accordingly. The BMPs prescribed for the initial construction phase include, but are not limited to: • Construction diversion ditch • Sediment reservoirs • Check dams • Level spreaders • Stabilized construction entrance • Slash • Sediment trap • Wattle • Terrace • Secondary containment berms • Detention ponds
Material Handling and Spill PreventionForm: (02 )
400254098
4/13/2012
Spill Prevention Control and Countermeasure Plans (SPCC) are in place to address material releases and to prescribe materials handling BMPs for the facility. "Good housekeeping" measures will be taken to ensure proper waste disposal.
Storm Water/Erosion ControlForm: (02 )
400254076
4/13/2012
Stormwater Management Plans (SWMP) are in place to comply with both Colorado Department of Public Health and Environment (CDPHE) and Colorado Oil and Gas Conservation Commission (COGCC) stormwater discharge permits. The construction layout for Deal Gulch 1-16 details Best Management Practices (BMPs) to be installed during initial construction. Note that BMPs may be removed, altered, or replaced with changing conditions in the field and the SWMP will be updated accordingly. The BMPs prescribed for the initial construction phase include, but are not limited to: • Construction diversion ditch • Sediment reservoirs • Check dams • Level spreaders • Stabilized construction entrance • Slash • Sediment trap • Wattle • Terrace • Secondary containment berms • Detention ponds
Material Handling and Spill PreventionForm: (02 )
400254076
4/13/2012
Spill Prevention Control and Countermeasure Plans (SPCC) are in place to address material releases and to prescribe materials handling BMPs for the facility. "Good housekeeping" measures will be taken to ensure proper waste disposal.