COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (04)
400535836
02/19/2014
1) If this cementing work changes the top of cement on the casing, then submit a form 5 - Drilling Completion Report. 2) Provide notice to pressure test the casing prior to returing the well to active status 3) Submit a form 21 - MIT with a successful pressure test and prior to or at the same time of returning the well to active status 3) If the pressure test is not witnessed by the COGCC be sure to submit a chart recording of the test.
OGLAForm: (06)
404069426
02/06/2025
This oil and gas location is located within a CPW-mapped 500 foot buffer of the Ordinary High Water Mark of Maudin Gulch for protection of Aquatic Native Species Conservation Water High Priority Habitat. At a minimum, Operator will review the stormwater program and implement stormwater BMPs and erosion control measures as needed to prevent fine-grained sediment and impacted stormwater runoff from entering surface water. Operator will use secondary containment for all tanks and other liquid containers. 
PermitForm: (06)
404069426
03/12/2025
Submit Operator's Monthly Production Reports (Form 7) required for compliance with Rule 413 within 30 days MR-MN missing 9/2024
EngineerForm: (06)
404069426
03/14/2025
Submit Completed Interval Reports (Form 5A) required for compliance with Rule 416 within 30 days Sundance completion and abandonment Dakota completion and abandonment
EngineerForm: (06)
404069426
03/17/2025
1) Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations and electronic Form 42 Notice of Plugging Operations 48 hours prior to mobilizing for plugging operations. These are two separate notifications, required by Rules 405.e and 405.l. 2) Prior to placing cement above the surface casing shoe: verify that all fluid (liquid and gas) migration has been eliminated. If evidence of fluid migration or pressure remains, contact ECMC Engineer for an update to plugging orders. 3) Pump surface casing shoe plug only after isolation has been verified. If surface casing cement is not circulated to surface, shut-in, WOC 4 hours then tag plug – must be at 440’ or shallower and provide a minimum of 100' plug at the surface. 4) Leave at least 100’ of cement in the wellbore for each plug without mechanical isolation. 5) After surface plug and prior to cap, verify isolation by either a 15 minute bubble test or 15 minute optical gas imaging. If there is indication of flow contact ECMC Engineering. Provide a statement on the 6SRA which method was used and what was observed. Retain records of final isolation test for 5 years. 6) With the Form 6 SRA operator must provide written documentation which positively affirms each COA listed above has been addressed.
EngineerForm: (06)
404069426
03/17/2025
Prior to starting plugging operations a bradenhead test shall be performed if there has not been a reported bradenhead test within the 60 days immediately preceding the start of plugging operations. 1) If, before opening the bradenhead valve, the beginning pressure is greater than 25 psi, sampling is required. 2) If pressure remains at the conclusion of the test, or if any liquids were present during the test, sampling is required. The Form 17 shall be submitted within 10 days of the test. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions. If samples are collected, copies of all final laboratory analytical results shall be provided to the ECMC within three (3) months of collecting the samples.
EngineerForm: (06)
404069426
03/17/2025
Consistent with Rule 911.a, a Form 27 must be approved prior to cut and cap, conducting flowline abandonment, or removing production equipment. Allow 30 days for Director review of the Form 27; include the Form 27 document number on the Form 44 for offsite flowline abandonment (if applicable) and on the Form 6 Subsequent. Properly abandon flowlines per Rule 1105. If flowlines will be abandoned in place, include with the Form 27: pressure test results conducted in the prior 12 months as well as identification of any document numbers for a ECMC Spill/Release Report, Form 19, associated with the abandoned line.
EngineerForm: (06)
404069426
03/18/2025
Operator will submit a Form 4 Sundry for this injection well per Rule 803.m, noting the date of discontinuance of injection, the reason for discontinuance of injection, and detailing their future plans for the Class II UIC well. The Sundry is due within 10 days of the discontinuance of injection operations. If the Operator wishes the UIC Facility to be closed, include such a request. This will result in the cancellation of the Class II UIC permit, and end the regulatory requirements of maintaining a Class II UIC well. The well will be subject to all other Rules, policies, notices, and permit conditions of the Commission.
 