| Wildlife | Form: (02 ) 400289142 7/27/2012 | • Prohibit Encana employees and contractors from carrying projectile weapons on
Encana leases.
• Prohibit pets on Encana leases.
• Strategically apply fugitive dust control measures, including enforcing established
speed limits on Encana private roads, to reduce fugitive dust and coating of
vegetation and deposition in water sources.
|
| Construction | Form: (02 ) 400289142 7/27/2012 | • Use solar panels as an alternative energy source for on-location production
equipment, where appropriate, economically and technically feasible.
• Use multiple gathering lines placed in a single trench to minimize disturbance and
construction, where appropriate, economically and technically feasible.
• Install pipeline crossings at right angles to the drainages, wetlands, and perennial
water bodies, where appropriate, economically and technically feasible.
|