COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02)
400197673
09/06/2011
1)COMPLIANCE WITH THE MOST CURRENT REVISION OF THE NORTHWEST COLORADO NOTIFICATION POLICY IS REQUIRED. 2)GARFIELD COUNTY RULISON FIELD NOTICE TO OPERATORS. NOTE: ALL NOTICES SHALL BE GIVEN VIA E-MAIL. SEE ATTACHED NOTICE 3)THE PROPOSED SURFACE CASING IS MORE THAN 50' BELOW THE DEPTH OF THE DEEPEST WATER WELL WITHIN 1MILE OF THE SURFACE LOCATION WHEN CORRECTED FOR ELEVATION DIFFERENCES. THE DEEPEST WATER WELL WITHIN 1 MILE IS 340 FEET DEEP.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Material Handling and Spill PreventionForm: (02 )
400197673
10/6/2011
Spill Prevention Control and Countermeasure (SPCC) Plans in accordance with 40 CFR, Part 112. Secondary containment for oil and produced water vessels in accordance with COGCC rules.
WildlifeForm: (02 )
400197673
10/6/2011
Bird protection practices with the Migratory Bird Act.
General HousekeepingForm: (02 )
400197673
10/6/2011
Waste minimization practices including re-use and recycling when practicable Waste management (handling and disposal) practices in accordance with COGCC rules and RCRA guidelines as applicable. Good housekeeping practices relative to overall site condition.
Drilling/Completion OperationsForm: (02 )
400197673
10/6/2011
Spill reporting and clean-up per COGCC guidelines, EPA regulations, CDPEH regulations, and Noble Energy, Inc. policies.
PlanningForm: (02 )
400197673
10/6/2011
Traffic minimization practices whenever possible in order to reduce dust, noise, congestion, road maintenance. Noise minimization. Use of multi-well pad sites for the purpose of minimizing areas of disturbance, traffic, and environmental impact. Proper reclamation and reseeding practices in accordance with COGCC rules, landowner requirements and BLM stipulations as applicable.
Storm Water/Erosion ControlForm: (02 )
400197673
10/6/2011
Stormwater management practices during construction and interim reclamation phases in accordance with CDPEH regulations. Stormwater management practices in accordance with COGCC rules throughout the operating life of the locations.
Interim ReclamationForm: (02 )
400197673
10/6/2011
Use of portable toilets whenever long-term activities are occurring onsite.