| Engineer | Form: (02) 400124158 02/03/2011 | 1) COMPLIANCE WITH THE MOST CURRENT REVISION OF THE NORTHWEST COLORADO NOTIFICATION POLICY IS REQUIRED.
2) PROVIDE CEMENT COVERAGE FROM THE INTERMEDIATE CASING SHOE TO A MINIMUM OF 200' ABOVE TOP OF GAS [OR OTHER SHALLOWEST-KNOWN PRODUCING HORIZON]. VERIFY CEMENT WITH A CEMENT BOND LOG.
3) PRODUCTION CASING CEMENT TOP VERIFICATION BY CBL REQUIRED.
4) THE PROPOSED SURFACE CASING IS MORE THAN 50' BELOW THE DEPTH OF THE DEEPEST WATER WELL WITHIN 1MILE OF THE SURFACE LOCATION WHEN CORRECTED FOR ELEVATION DIFFERENCES. THE DEEPEST WATER WELL WITHIN 1 MILE IS 900 FEET DEEP.
|
| Engineer | Form: (04) 403237871 11/28/2022 | 1) Operator shall comply with COGCC Rule 419. Bradenhead Monitoring, Testing, and Reporting and Rule 420. Form 17, Bradenhead Test Report
2) At least once a year shut in bradenhead for 7 days or until the pressure reaches the bradenhead threshold and perform a bradenhead test. Report results on a Form 17, as specified in Rule 420 or other Director approved submittal method.
3) Within 30 days of completing the work, submit a Form 4 Subsequent Report - Bradenhead Plan -Include diagnostic information on causal factors for continuous intermediate casing pressure.
4) Complete installation of BH monitoring system by 3/31/2023
|