| Engineer | Form: (04) 404029355 02/06/2025 | Operator shall continue to monitor pressure and report to ECMC through annual testing. If monitored well conditions meet reaction threshold or indicate a deficiency, a new bradenhead test and sundry must be filed. |
| Engineer | Form: (04) 404600797 04/02/2026 | 1) Operator shall continue to monitor pressure and report to ECMC through annual testing. If monitored well conditions meet action threshold or indicate a deficiency, a new bradenhead test and sundry must be filed. Sundry should include monthly pressure monitoring data.
2) Due to bradenhead tests that demonstrate liquid flow, on the next bradenhead test form include an estimate on liquid volume and identify the correct fluid flow and type within the table. |