| Engineer | Form: (06) 401277541 06/19/2017 | 1)Provide 48 hour notice of plugging MIRU via electronic Form 42.
2)Properly abandon flowlines per Rule 1103. File electronic Form 42 when flowline abandonment is complete.
3)Check bradenhead pressure prior to operations and contact COGCC area engineer Craig Burger if pressure is greater than 65 psi. |