Field Inspector | Form: (04 ) 400680141 2/23/2015 | Follow up inspection performed |
Engineer | Form: (06 ) 402049333 5/28/2019 | Plugging:
1) Provide 48 hour notice of MIRU via electronic Form 42.
Venting during plugging:
Operator shall implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard to public welfare.
|