COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
OGLAForm: (06 )
403352051
3/28/2023
Due to proximity to a mapped wetland and surface water, operator will use secondary containment for all tanks and other liquid containers. Operator will implement stormwater BMPs and erosion control measures as needed to prevent sediment and stormwater runoff from entering the wetland and surface water.
EngineerForm: (06 )
403352051
4/4/2023
Properly abandon flowlines per Rule 1105. If flowlines will be abandoned in place, include with the Form 27: pressure test results conducted in the prior 12 months as well as identification of any document numbers for a COGCC Spill/Release Report, Form 19, associated with the abandoned line.
EngineerForm: (06 )
403352051
4/4/2023
Consistent with Rule 911.a, a Form 27 must be approved prior to cut and cap, conducting flowline abandonment, or removing production equipment. Allow 30 days for Director review of the Form 27; include the Form 27 document number on the Form 44 for offsite flowline abandonment (if applicable) and on the Form 6 Subsequent.
EngineerForm: (06 )
403352051
4/4/2023
Plugging 1) Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations and electronic Form 42 Notice of Plugging Operations 48 hours prior to mobilizing for plugging operations.   2) Plugs and squeezes will be placed as stated in the Plugging Procedure section of the approved NOIA unless revised by COA or prior approval from COGCC is obtained. 3) The wellbore must be static prior to placing cement plugs which are to be a minimum of 100' in length for all but surface plugs. Mechanical isolation requires a 25' cement plug, minimum. For plugs not specified to be tagged, a tag is required if circulation is not maintained while pumping plug and displacing to depth. Tag at tops specified or shallower. Notify COGCC Area Engineer before adding cement to previous plug. 4) Place a 50' plug (minimum) at the surface, both inside the inner most casing and in all annular spaces. Surface plugs shall be circulated to surface. Confirm cement to surface in all strings during cut and cap. 5) With the Form 6 SRA operator must provide written documentation which positively affirms each COA has been addressed. Submmit all logs run for the plugging. 6) Operator must wait a sufficient time on all plugs to achieve the intended design. If at any time duriing the plugging there is evidence of previously unreported pressure or fluid migration, contact COGCC Area Engineer before continuing operations. 7) Plugging procedure has been modified as follows, All plugs will be 60/40 POZ w/ 4% Gel Class A Cement, Yielding 1.42 cu.Ft/SX* Plug #1 - 4970', CIBP with 5 sx of cement. Plug #2 - 4490-4390', 20 sx of cement casing plug. Plug #3 - 2100', perf and squeeze 40 sx into CICR at 2050', place 5 sx on top of retainer to bring top of cement in the casing to 2000'. If a CICR is not used, pump 50 sx of cement and displace top of cement to 2000'. WOC and tag. Plug #4 - 475', perf and squeeze 110 sx with the intention to circulate cement to the surface. If perfs will take fluid but do not circulate or circulation is lost, pump a minimum of 60 sx and displace to 322', 100' above the surface shoe, WOC and tag at 372' or shallower. Notify COGCC Area Engineer of insufficient cement prior to pumping additional plugs. Plug #5 - 50' of cement at the surface in both the casing and the annulus per COA #4. 8) Submit corrected WBD to correspond with approved 6(N) prior to filing Form 42 Notifications required in COA #1 above.
EngineerForm: (06 )
403352051
4/4/2023
Bradenhead Testing Prior to starting plugging operations a bradenhead test shall be performed if there has not been a reported bradenhead test within the 60 days immediately preceding the start of plugging operations. 1) If, before opening the bradenhead valve, the beginning pressure is greater than 25 psi, sampling is required. 2) If pressure remains at the conclusion of the test, or if any liquids were present during the test, sampling is required. The Form 17 shall be submitted within 10 days of the test. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions. If samples are collected, copies of all final laboratory analytical results shall be provided to the COGCC within three (3) months of collecting the samples. If there is a need for sampling, contact COGCC engineering for verification of plugging procedure.
 
COGIS - Best Management Practice Results
No records to display.