| Engineer | Form: (02) 401336651 08/29/2017 | 1) Provide 48 hour notice prior to spud via electronic Form 42.
2) If production casing is set provide cement coverage to at least 200’ above the Marmaton and cement across Cheyenne/Dakota interval: (4700’-4050’). Run and submit CBL to verify cemented intervals.
3) If well is a dry hole set plugs at the following depths: 40 sks cement +/- 50’ above the Osage, 40 sks cement +/- 50’ above the Marmaton, 40 sks cement +/- 50’ above any DST w/ oil or gas show, 40 sks cement at 4700’ up, 40 sks cement at 4050’ up, 50 sks cement
from 50’ below surface casing shoe up into surface casing, 15 sks cement in top of
surface casing, cut 4 ft below GL, weld on plate, 5 sks cement each in rat hole and
mouse hole. |
| Engineer | Form: (02) 401336651 08/29/2017 | Bradenhead tests shall be performed and reported according to the following schedule
and Form 17 submitted within 10 days of each test.:
1) All: Within 60 days of rig release, prior to stimulation.
2) Delayed completion: 6 months after rig release, prior to stimulation.
3) All: Within 30 days of first production, as reported on Form 5A.
|
| Engineer | Form: (02) 403902902 10/08/2024 | Operator to submit a Form 5A to document new formation completion |
| Engineer | Form: (02) 403902902 10/08/2024 | Operator to control emissions and venting during flowback. |