COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02)
400817914
05/18/2015
1) Provide 48 hour notice prior to spud via electronic Form 42. 2) If production casing is set provide cement coverage to at least 200’ above the shallowest completed interval or Lansing, whichever is shallower and cement Cheyenne/Dakota interval (5100’-4500’). Run and submit CBL to verify cemented intervals. 3) If well is a dry hole set plugs at the following depths: 40 sks cement +/- 50’ above the Spergen, 40 sks cement +/- 50’ above the Cherokee, 40 sks cement +/- 50’ above the Marmaton, 40 sks cement across any DST w/ show, 40 sks cement 50’ below Cheyenne (5100’ up), 40 sks cement 50’ above top of Dakota (4500’ up), 50 sks cement from 50’ below surface casing shoe up into surface casing, 15 sks cement in top of surface casing, cut 4 ft below GL, weld on plate, 5 sks cement each in rat hole and mouse hole.
EngineerForm: (04)
400977117
03/02/2016
1) Venting or flaring of natural gas shall comply with COGCC Rule 912. 2) Submit requests to flare annually to COGCC on Form 4 (Sundry Notice), which discusses timing to connect to sales line, plans to develop infrastructure, and justification for continued venting/flaring. Provide gas analysis including H2S with each Sundry Notice. 3) Report flaring volumes on Form 7, Operator’s Monthly Report of Operations. 4) The operator is required to obtain and maintain any required air permits from CDPHE. The combustion device must comply with applicable design destruction efficiency for hydrocarbons (typically enclosed device 98%). 5) Notify the local emergency dispatch or the local governmental designee of natural gas flaring.
EngineerForm: (04)
401215692
04/26/2017
1) Venting or flaring of natural gas shall comply with COGCC Rule 912. 2) Submit requests to flare annually to COGCC on Form 4 (Sundry Notice), which discusses timing to connect to sales line, plans to develop infrastructure, and justification for continued venting/flaring. Provide gas analysis including H2S with each Sundry Notice. 3) Report flaring volumes on Form 7, Operator’s Monthly Report of Operations. 4) The operator is required to obtain and maintain any required air permits from CDPHE. The combustion device must comply with applicable design destruction efficiency for hydrocarbons (typically enclosed device 98%).
EngineerForm: (04)
401522296
08/20/2019
This is an after the fact acknowledgement/approval of the annual request to flare. for March 1, 2018 until March 1, 2019.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
ConstructionForm: (02 )
400817914
5/29/2015
Certificate to Discharge Under CDPHE General Permit No. COR-030000 Stormwater Dishcarges Associated with Construction Certification No. COR31825 Prior to construction, perimeter controls will be installed utilizing cuttings from the clearing operations. Once the well pad has been constructed a variety of BMP's shall be utilized for the site specific condtiions. BMP's to be utilized may include, but are not limited to: -Dirt Ditch/Berm -Erosion Control Blankets -Straw Bale Barrier -Straw Wattles -Seeding -Imported Hard Armor -Check Dams -Culvert/Culvert Protection -Crimped Straw -Silt Fence -Surface Roughening/Surface Rip During construction, each site will be inspected every 14 days and 24-72 hours after any precipitation event causing erosion depending on the current site activities. These inspections will be recorded and maintained at Nighthawk's office. Repairs shall be completed as soon as possible after an inspection reporting BMP repairs are required. Any site specific modifications will be revised on the site plan when implemented at the site. A field wide Stormwater Management Plan (SWMP) for the Project Area is located at Nighthawk's office. Spill Protection Control and Countermeasures (SPCC) plans for the Project Area are stored on file at Nighthawk's office. The field wide SWMP addresses SPCC during construction operations.
Drilling/Completion OperationsForm: (02 )
400817914
5/29/2015
Open-hole Resistivity Log with Gamma Ray Log will be run from TD into the surface casing. A Cement Bond Log with Gamma-Ray will be run on production casing, or on intermediate casing if a production liner is run. The Form 5, Completion Report, will list all logs run and have those logs attached.