WELL05-073-06549JOHN CRAIG
1-2
JWC OPERATING LLC
10762
SI
5/1/2025
HOMESTEAD
36800
LINCOLN  073
NENE 2 10S56W 6
433989View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02 )
400371910
8/22/2013
1) Provide 48 hour notice prior to spud via electronic Form 42. 2) Set at least 400’ of surface casing for aquifer protection. (WW Permit # 0050414-MH, gs~5240, SS@260’-280’). 3) If production casing is set provide cement coverage to at least 200’ above the shallowest completed interval or 200’ above Marmaton whichever is shallower and cement across Cheyenne/Dakota interval: (4700’-4150’ minimum). Run and submit CBL to verify cemented intervals. 4) If well is a dry hole set plugs at the following depths: 40 sks cement +/- 50’ above the Morrow, 40 sks cement +/- 50’ above the Marmaton, 40 sks cement +/- 50’ above any DST w/ show, 40 sks cement at 4700’ up, 40 sks cement at 4150’ up, 50 sks cement from 50’ below surface casing shoe up into surface casing, 15 sks cement in top of surface casing, cut 4 ft below GL, weld on plate, 5 sks cement each in rat hole and mouse hole.
PermitForm: (05 )
400514563
12/20/2013
Operator shall submit core analysis for sidewall cores when analysis is complete.
EngineerForm: (04 )
400720052
1/22/2015
1) The venting or flaring of natural gas shall be conducted in accordance with COGCC Rule 912 for the initial production test period. 2) Notify the local emergency dispatch or the local governmental designee of any natural gas flaring. 3) If flaring will continue more than 6 months, submit updated requests to flare to COGCC on Form 4 (Sundry Notice), which discusses timing to connect to sales line, plans to develop infrastructure, and justification for continued venting/flaring. 4) The operator is required to obtain and maintain any required air permits from CDPHE. 5) The venting or flaring volumes shall be reported by Form 7, Operator’s Monthly Report of Operations.
EngineerForm: (04 )
400982031
3/3/2016
1) Submit requests to flare annually to COGCC on Form 4 (Sundry Notice), which discusses timing to connect to sales line, plans to develop infrastructure, and justification for continued venting/flaring. Provide gas analysis including H2S with each Sundry Notice. 2) Venting or flaring of natural gas shall comply with COGCC Rule 912. 3) Report flaring volumes on Form 7, Operator’s Monthly Report of Operations. 4) Notify the local emergency dispatch or the local governmental designee of natural gas flaring. 5) The operator is required to obtain and maintain any required air permits from CDPHE. The combustion device must comply with applicable design destruction efficiency for hydrocarbons.
EngineerForm: (04 )
401216017
4/26/2017
1) Venting or flaring of natural gas shall comply with COGCC Rule 912. 2) Submit requests to flare annually to COGCC on Form 4 (Sundry Notice), which discusses timing to connect to sales line, plans to develop infrastructure, and justification for continued venting/flaring. Provide gas analysis including H2S with each Sundry Notice. 3) Report flaring volumes on Form 7, Operator’s Monthly Report of Operations. 4) The operator is required to obtain and maintain any required air permits from CDPHE. The combustion device must comply with applicable design destruction efficiency for hydrocarbons (typically enclosed device 98%).
EngineerForm: (04 )
402083268
12/19/2019
1) Venting or flaring of natural gas shall comply with COGCC Rule 912. 2) Submit requests to flare annually to COGCC on Form 4 (Sundry Notice), which discusses timing to connect to sales line, plans to develop infrastructure, and justification for continued venting/flaring. Provide gas analysis including H2S with each Sundry Notice. 3) Report flaring volumes on Form 7, Operator’s Monthly Report of Operations. 4) The operator is required to obtain and maintain any required air permits from CDPHE. The combustion device must comply with applicable design destruction efficiency for hydrocarbons (typically enclosed device 98%).
EnvironmentalForm: (04 )
1310531
4/9/2021
All future sampling results related to Venting and flaring will be submitted through the Form 43 (Analytical Sample Submittal) process using an Electronic Data Deliverable (EDD) in an approved COGCC format provided by the laboratory.
EngineerForm: (04 )
1310531
7/20/2021
Gas must be metered, meter calibrated annually. Btu values should be reported with Form 7, Operators Report of Operations reflecting annual analysis.
EngineerForm: (04 )
1310531
7/20/2021
1) Flaring of natural gas shall comply with COGCC Rule 903. 2) Report metered flaring volumes on Form 7, Operator’s Monthly Report of Operations. 3) The operator is required to obtain and maintain any required air permits from CDPHE. 4) The expectation for permanent flares controlling separators will be an enclosed combustion device with a 98% design destruction efficiency for hydrocarbons. Operator shall manage this well so that production volumes do not exceed the combustor capacity. 5) Notify the local emergency dispatch or the local governmental designee of natural gas flaring.
EngineerForm: (04 )
1310531
7/20/2021
Presence of hydrogen sulfide should be reported on a Form 42, Field Operations Notice.
EngineerForm: (04 )
1310531
7/20/2021
Operator shall have an approved Gas Capture Plan or have sought and received a variance from the COGCC Commission for continued production without gas infrastructure, prior to January 15, 2022 or wells must be shut in by January 15, 2022.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
ConstructionForm: (02 )
400371910
8/28/2013
SEE ATTACHED