| Engineer | Form: (02) 400298930 08/16/2012 | 1) Provide 48 hour notice prior to spud via electronic Form 42.
2) If production casing is set provide cement coverage to at least 200’ above shallowest completed interval and across Cheyenne/Dakota interval (4650’-4000’ minimum). Run and submit CBL to verify cemented intervals.
3) If well is a dry hole set plugs at the following depths: 40 sks cement +/- 50’ above the Lansing, 40 sks cement across any DST or significant show, 40 sks cement at 4650’ up, 40 sks cement at 4000’ up, 50 sks cement from 50’ below surface casing shoe up into surface casing, 15 sks cement in top of surface casing, cut 4 ft below GL, weld on plate, 5 sks cement each in rat hole and mouse hole.
|
| Engineer | Form: (04) 400977144 03/02/2016 | 1) Venting or flaring of natural gas shall comply with COGCC Rule 912.
2) Submit requests to flare annually to COGCC on Form 4 (Sundry Notice), which discusses timing to connect to sales line, plans to develop infrastructure, and justification for continued venting/flaring. Provide gas analysis including H2S with each Sundry Notice.
3) Report flaring volumes on Form 7, Operator’s Monthly Report of Operations.
4) The operator is required to obtain and maintain any required air permits from CDPHE. The combustion device must comply with applicable design destruction efficiency for hydrocarbons (typically enclosed device 98%).
5) Notify the local emergency dispatch or the local governmental designee of natural gas flaring.
|
| Engineer | Form: (04) 401216186 04/26/2017 | 1) Venting or flaring of natural gas shall comply with COGCC Rule 912.
2) Submit requests to flare annually to COGCC on Form 4 (Sundry Notice), which discusses timing to connect to sales line, plans to develop infrastructure, and justification for continued venting/flaring. Provide gas analysis including H2S with each Sundry Notice.
3) Report flaring volumes on Form 7, Operator’s Monthly Report of Operations.
4) The operator is required to obtain and maintain any required air permits from CDPHE. The combustion device must comply with applicable design destruction efficiency for hydrocarbons (typically enclosed device 98%).
|
| Engineer | Form: (04) 401524375 09/28/2018 | 1) Flaring of natural gas shall comply with COGCC Rule 912.
2) Metered flaring volumes must also be reported on the Operators Report of Monthly Operations, Form 7.
3) The operator is required to obtain and maintain any required air permits from CDPHE.
4) Operator will use combustion device with design destruction efficiency for hydrocarbons. Wells are to be managed so that production volumes do not exceed combustor capacity.
5) Provide the local emergency dispatch or the local governmental designee prior notice of natural gas flaring by supplying them with the approved Sundry Notice and all attachments. If any changes are made regarding this Sundry or the flaring protocol, local government designee and emergency dispatch are to be notified prior to flaring when flaring can be reasonably anticipated, or as soon as possible, but in no event more than two (2) hours after the flaring occurs.
6) This approval is good until October 1, 2019. A new application will be required to continue flaring be submitted.
|
| Engineer | Form: (02) 402447949 10/11/2022 | Operator to provide a Form 5A for work done.
Operator to provide a Form 42 for MIRU. |
| Engineer | Form: (02) 402447949 10/11/2022 | Operator to provide a minimum of 200' of cement above the known TOC of 7060'. Document with a Form 5 and verify with a CBL. Work to be done prior to perforating and acidizing. |
| Engineer | Form: (02) 402447949 03/29/2023 | Form 4 Sundry for Gas Capture Plan needs to be submitted prior to flow test. |
| Engineer | Form: (02) 403441739 07/17/2023 | Form 4 Sundry for Gas Capture Plan needs to be submitted prior to flow test. |
| Engineer | Form: (02) 403441739 07/17/2023 | Operator to provide a Form 5A for work done.
Operator to provide a Form 42 for MIRU. |
| Engineer | Form: (02) 403441739 07/17/2023 | Previous COA to recement above the Marmaton is dropped for this Form 2. If the Marmaton is treated in the future, the COA for additional cement will be enforced. |