Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-073-06434Kerry
2
WIEPKING-FULLERTON ENERGY LLC
96340
PR
7/1/2020
GREAT PLAINS
32756
LINCOLN  073
SWSW 20 10S55W 6
420393View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02)
400099131
10/20/2010
1) Provide 24 hour notice of MIRU to Craig Quint at 719-767-8939 or e-mail at craig.quint@state.co.us. 2) If production casing is set provide cement coverage to at least 200’ above shallowest completed interval (200’ above CHRK at a minimum), and stage cement Cheyenne/Dakota interval (4600’-3950’ minimum). Run and submit CBL to verify cemented intervals. 3) If well is a dry hole set plugs at the following depths: 40 sks cement +/- 50’ above the Atoka, 40 sks cement across any DST w/ show, 40 sks cement 50’ below Cheyenne (4600’ up), 40 sks cement 50’ above top of Dakota (3950’ up), 50 sks cement from 50’ below surface casing shoe up into surface casing, 15 sks cement in top of surface casing, cut 4 ft below GL, weld on plate, 5 sks cement each in rat hole and mouse hole.
EnvironmentalForm: (04)
400961302
12/31/2015
Operator will submit Form 27 remediation plan by February 29, 2016. No form 19 spill report will be required.
Reclamation SpecialistForm: (04)
402250350
12/05/2019
Approval/Passing of the form 4 acknowledges that the Oil and Gas Conservation Commission has received the notice. A field inspection will be conducted at a future date to evaluate compliance with reclamation standards.
Reclamation SpecialistForm: (04)
402851947
12/20/2021
COGCC will not require further action at this time. If any future disturbances (i.e., subsequent operations) affect interim reclamation vegetation, Operator shall reclaim all disturbances as early as practicable to meet Rule 1003 standards. Should future conditions at the site indicate poor growth that is not reflective of reference areas, then further investigation and reclamation activities may be required.
 
COGIS - Best Management Practice Results
No records to display.