Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-073-06422BUBBA-STATE
2
WIEPKING-FULLERTON ENERGY LLC
96340
PR
7/1/2020
GREAT PLAINS
32756
LINCOLN  073
SWNW 20 10S55W 6
417917View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
AgencyForm: (02)
2589271
06/16/2010
1) Provide 24 hour notice of MIRU to Craig Quint at 719-767-8939 or e-mail at craig.quint@state.co.us. 2) If production casing is set provide cement coverage to at least 200’ above shallowest completed interval (200’ above Cherokee at a minimum), and stage cement 100’ below to 50’ above Cheyenne/Dakota interval (4520’-4010’ minimum). Run and submit CBL to verify all cemented intervals. 3) If well is a dry hole set plugs at the following depths: 40 sks cement +/- 50’ above the Cherokee, 40 sks cement across any DST w/ show, 40 sks cement 100’ below Cheyenne (4520’ up), 40 sks cement 50’ above top of Dakota (4010’ up), 50 sks cement from 50’ below surface casing shoe up into surface casing, 15 sks cement in top of surface casing, cut 4 ft below GL, weld on plate, 5 sks cement each in rat hole and mouse hole.
 
COGIS - Best Management Practice Results
No records to display.