| Engineer | Form: (02) 403358034 06/08/2023 | 1) Submit Form 42 electronically to COGCC 2 business days prior to MIRU (spud notice) for the first well activity with a rig on the pad.
2) If groundwater flow or hydrocarbon bearing zones are encountered during drilling, cement the production casing to 500' above the zone.
3) If dry hole, set minimum 100' plugs across the Lyons and Dakota formation tops and half-in half out of the surface casing shoe. |
| Engineer | Form: (04) 403521818 10/10/2023 | For any new drilling changes, immediately contact area engineer for verbal approval before operations commence and any form is submitted. |
| Engineer | Form: (04) 403521818 10/10/2023 | 1) This Sundry Notice Form 4 authorizes changes to the drilling/casing/cementing program as shown on the Drilling Permit Form 2 and must be visibly posted with the permit during drilling.
2) If groundwater flow or hydrocarbon bearing zones are encountered during drilling, cement the production casing to 500' above the zone.
3) If dry hole, set minimum 100' plugs across the Lyons and Dakota formation tops and half-in half out of the surface casing shoe. |
| Engineer | Form: (04) 403878361 09/03/2024 | 1) Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations.
2) Operator shall implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare. |