Engineer | Form: (02 ) 403309246 4/11/2023 | 1) Submit Form 42 electronically to COGCC 2 business days prior to MIRU (spud notice) for the first well activity with a rig on the pad.
2) If groundwater flow or hydrocarbon bearing zones are encountered during drilling, cement the production casing to 500' above the zone.
3) If dry hole, set minimum 100' plugs across the Lyons and Dakota formation tops and half-in half out of the surface casing shoe. |
Engineer | Form: (04 ) 403536221 10/20/2023 | 1) This Sundry Notice Form 4 authorizes changes to the drilling/casing/cementing program as shown on the Drilling Permit Form 2 and must be visibly posted with the permit during drilling. |