Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-071-09926BBB
33 SESE 2860
BNL (ENTERPRISE) INC
10763
SI
8/1/2024
WILDCAT
99999
LAS ANIMAS  071
SESE 33 28S60W 6
483886View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02 )
403308710
4/11/2023
1) Submit Form 42 electronically to COGCC 2 business days prior to MIRU (spud notice) for the first well activity with a rig on the pad. 2) If groundwater flow or hydrocarbon bearing zones are encountered during drilling, cement the production casing to 500' above the zone. 3) If dry hole, set minimum 100' plugs across the Lyons and Dakota formation tops and half-in half out of the surface casing shoe.
EngineerForm: (04 )
403536137
10/20/2023
This Sundry Notice Form 4 authorizes changes to the drilling/casing/cementing program as shown on the Drilling Permit Form 2 and must be visibly posted with the permit during drilling.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Drilling/Completion OperationsForm: (02 )
403308710
4/18/2023
The well be logged open hole from TD to 7 inch casing with a triple combo log suite. Additionally, a GR/CBL/Neutron will run inside 7 inch casing to surface.