| Engineer | Form: (02) 402865827 11/22/2021 | 1)If groundwater flow or hydrocarbon bearing zones are encountered during drilling, cement the production casing to 500' above the zone.
2) If dry hole, set minimum 100' plugs across the Lyons and Dakota formation tops and half in-half out of the surface casing shoe. |
| Permit | Form: (02) 402865827 12/09/2021 | The operator will perform an inclination survey of the wellbore per Rule 410.c. The operator will file the inclination survey with the Form 5 per Rule 410.c.(1). |
| OGLA | Form: (04) 403333117 03/06/2023 | Operator will control any emissions and fluids during perforating operations. |
| Engineer | Form: (04) 403605918 07/30/2024 | Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations. |
| Engineer | Form: (04) 403605918 07/30/2024 | For all Wells other than coalbed methane Wells, an Operator will perform an annual Bradenhead test and submit the data to the
Director on a Form 17 or other Director-approved method. |