| Engineer | Form: (06) 400292655 06/11/2012 | 1) Provide 48 hour notice of MIRU to John Duran at 719-846-4715 or email John.Duran@state.co.us.
2) Plug verification: Tag 17 sack cement plug at 531' - 431' or set on top of CIBP. Required only if pressure test of casing fails after plug at 1920' is set.
|
| Engineer | Form: (06) 400464305 09/12/2013 | 1) Provide 48 hour notice of MIRU to John Duran at 719-846-4715 or email John.Duran@state.co.us.
2) Tag shoe plug if casing does not pressure test.
|