COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
OGLAForm: (06)
402922499
02/03/2022
Operator will implement measures to capture, combust, or control emissions to protect health and safety, and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard to public health, welfare and the environment.
OGLAForm: (06)
402922499
02/03/2022
This oil and gas location is located within the CPW-mapped Bosque del Oso State Wildlife Area (SWA), Mule Deer and Elk Winter Concentration Area, Elk Severe Winter Range Area, and Elk Production Area High Priority Habitats. At a minimum since this location is within a SWA, operator will consult with CPW prior to commencing plugging and abandonment (PA) activities if operations are planned to take place between December 1 and June 30.
EngineerForm: (06)
402922499
02/17/2022
1)Perform bradenhead test prior to MIRU if test has not been performed within six months of plugging. Submit results on Form 17. Contact area environmental protection specialist for sampling and analysis requirements if initial bradenhead pressure is greater than 25 psi. 2)Prior to placing the surface casing shoe plug: verify that all fluid migration (liquid and gas) has been eliminated. If evidence of fluid migration or pressure remains, contact COGCC Engineer for an update to plugging orders. 3)Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations and electronic Form 42 Notice of Plugging Operations 48 hours prior to mobilizing for plugging operations. 4)The approved Form 6, Notice of Intent will be at the location during all phases of plugging operations. 5)Properly abandon flowlines as per Rule 1105. Pursuant to Rule 911.a. Closure of Oil and Gas Facilities, Operator will submit Site Investigation and Remediation Workplans via Form 27 for COGCC prior approval before cutting and capping the plugged well, conducting flowline abandonment, and removing production equipment. Pursuant to Rule 1105.f. Abandonment Verification, within 90 days of an operator completing abandonment requirements for a flowline or crude oil transfer line, an operator must submit a Field Operations Notice, Form 42-Abandonment of Flowlines for on-location flowlines, and a Flowline Report, Form 44, for off-location flowlines or crude oil transfer lines.
 
COGIS - Best Management Practice Results
No records to display.