| Engineer | Form: (04) 402065907 06/10/2020 | Perform a bradenhead test and submit a Form 17 prior to submittal of the next year’s request for continued TA status.
A new application must be made before July 6, 2020. Updates for the planned utilization of the well should be included with the application.
A Form 5A, Completed Interval Report, is required to report all plugs currently downhole which isolate any perforated interval.
The Form 7, Operators Report of Monthly Operations, must correctly reflect the well status and dates reported on the Form 4, Sundry Notice-Request for Continued Temporarily Abandoned Status.
|
| Engineer | Form: (04) 402623336 06/30/2021 | This approval is good for one year and a new application must be made before June 1, 2022 (1 year from prior application). Updates for the planned utilization of the well should be included with the application.
The Form 7, Operators Report of Monthly Operations, must correctly reflect the well status and dates reported on the Form 4, Sundry Notice-Request for Continued Temporarily Abandoned Status.
|
| Engineer | Form: (06) 403667907 02/14/2024 | 1. Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations and electronic Form 42 Notice of Plugging Operations 48 hours prior to mobilizing for plugging operations. These are two separate notifications, required by Rules 405.e and 405.l. |
| Engineer | Form: (06) 403667907 02/14/2024 | 2. The approved Form 6, Notice of Intent will be at the location during all phases of plugging operations. |
| Engineer | Form: (06) 403667907 02/14/2024 | 3. Operator shall implement measures to control venting and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard. |
| Engineer | Form: (06) 403667907 02/14/2024 | 4. If applicable properly abandon flowlines as per Rule 1105. Pursuant to Rule 911.a. Closure of Oil and Gas Facilities, Operator will submit Site Investigation and Remediation Work plans via Form 27 for COGCC prior approval before cutting and capping the plugged well, conducting flowline abandonment, and removing production equipment. Pursuant to Rule 1105.f. Abandonment Verification, within 90 days of an operator completing abandonment requirements for a flowline or crude oil transfer line, an operator must submit a Field Operations Notice, Form 42-Abandonment of Flowlines for on-location flowlines, and a Flowline Report, Form 44, for off-location flowlines or crude oil transfer lines. |
| Engineer | Form: (06) 403667907 02/14/2024 | 5. In accordance with the Notice to Operators (NTO): Timing for ECMC Forms adopted on 05/01/2020, this Form 6 Notice of Intent to Abandon is valid for 12 months from the date of approval expiring on 02/14/2025. This NTO does not alter the deadlines for submission of, or compliance with any other Commission rule or Form. |
| Engineer | Form: (06) 403667907 02/14/2024 | 6. Prior to starting plugging operations a bradenhead test shall be performed if there has not been a reported bradenhead test within the 60 days immediately preceding the start of plugging operations.
If, before opening the bradenhead valve, the beginning pressure is greater than 25 psi, sampling is required.
If pressure remains at the conclusion of the test, or if any liquids were present during the test, sampling is required.
The Form 17 shall be submitted within 10 days of the test. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions. If samples are collected, copies of all final laboratory analytical results shall be provided to the COGCC within three (3) months of collecting the samples.
|
| Engineer | Form: (06) 403667907 02/14/2024 | 7. Operator shall notify ECMC engineering staff of any plugging changes required by the BLM or unexpected conditions in the field as soon as feasible.
|
| Engineer | Form: (06) 403667907 02/14/2024 | 8. With the Form 6 SRA operator must provide written documentation, which positively affirms each COA listed above has been addressed. |