Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-069-06314MSSU
30-16
PROSPECT ENERGY LLC
10312
PA
4/14/2017
FORT COLLINS
25100
FORT COLLINS/LARIMER  069
NWSE 30 8N68W 6
333082View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (06)
401246097
03/31/2017
Prior to initiation of plugging operations, a Bradenhead test shall be performed. If there is 25# or greater present at the beginning of the test call COGCC Engineer for possible sampling requirements. Form 17 shall be submitted within 10 days.
EngineerForm: (06)
401246097
03/31/2017
NOTE: Changes in plugging procedure - shoe plug moved to 590' 1) Provide 48 hour notice of plugging MIRU via electronic Form 42. 2) If shoe plug not circulated to surface (or falls back) - tag plug, must be 150' or shallower and place 10 sx at surface (or top off). 3) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete.
 
COGIS - Best Management Practice Results
No records to display.