UIC | Form: (04 ) 401596066 11/13/2018 | If operator wishes to return well to injection operator must remove plugs (3) and pass MIT on casing or tubing-casing annulus from within 100 ft of top perforation (@5042 ft) before resumption of injection. |
UIC | Form: (05 ) 401596652 11/13/2018 | If operator wishes to return well to injection operator must remove plugs (3) and pass MIT on casing or tubing-casing annulus from within 100 ft of top perforation (@5042 ft) before resumption of injection. |
UIC | Form: (05A ) 401610698 11/13/2018 | If operator wishes to return well to injection operator must remove plugs (3) and pass MIT on casing or tubing-casing annulus from within 100 ft of top perforation (@5042 ft) before resumption of injection. |
Engineer | Form: (04 ) 401596066 7/9/2019 | Cement bond log to be run prior to returning to PR/IJ to document previous repair. |
Engineer | Form: (04 ) 402237869 3/18/2021 | Form 7 production reporting data is delinquent; Operator shall update Form 7 production reporting with the next reporting cycle by 04/15/2021. |
Engineer | Form: (04 ) 402237869 3/18/2021 | Operator shall submit annual requests for continued temporarily abandoned status updating plans to utilize well and justification for continued temporarily abandoned status within 2 weeks, by Apr. 1st, 2021. |