Engineer | Form: (02 ) 1633891 3/22/2011 | Provide 24 hour notice of MIRU to Ed Binkley at 970-506-9834 or e-mail at ed.binkley@state.co.us Prior to recomplete, operator must: 1) Provide remedial cement 200’ below Shannon to 200’ above Shannon (minimum coverage 1630’ to 1230’), and 630’ into the surface casing shoe. Verify remedial cement coverage with cement bond log. 2) Submit Form 4 Sundry once recomplete is performed to change from injector well to producing well. |
Engineer | Form: (06 ) 401245800 3/28/2017 | Prior to initiation of plugging operations, a Bradenhead test shall be performed. If there is 25# or greater present at the beginning of the test call COGCC Engineer for possible sampling requirements. Form 17 shall be submitted within 10 days. |
Engineer | Form: (06 ) 401245800 3/28/2017 | NOTE: Changes in plugging procedure. CBL to be run prior to plugging to verify existing coverage - should be run from 1300' to surface - submit to COGCC for verification of plugging orders. Additional plugs may be required.
1) Provide 48 hour notice of plugging MIRU via electronic Form 42.
2) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete.
|