Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-069-06087MSSU
30-5
PROSPECT ENERGY LLC
10312
PA
4/14/2017
FORT COLLINS
25100
FORT COLLINS/LARIMER  069
NWSE 30 8N68W 6
333082View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (06 )
401252458
4/11/2017
1) Provide 48 hour notice of plugging MIRU via electronic Form 42. 2) For 550’ plug (surface casing shoe plug), if not circulated to surface then tag plug – must be 200’ or shallower and provide 10 sx plug at the surface. 3) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete.
EngineerForm: (06 )
401252458
4/11/2017
Prior to initiation of plugging operations, a Bradenhead test shall be performed. If there is 25# or greater present at the beginning of the test call COGCC Engineer for possible sampling requirements. Form 17 shall be submitted within 10 days.
 
COGIS - Best Management Practice Results
No records to display.