| Engineer | Form: (06) 2090385 05/05/2014 | NOTE: Changes in plugging procedure - additional plugs at 1905' and 750'.
1) Provide 48 hour notice of plugging MIRU via electronic Form 42.
2) For 1905’ plug: perforate, pump plug and displace - tag plug – must be 1805’ or shallower. If surface casing plug not circulated to surface then tag plug – must be 230’ or shallower and provide 10 sx plug at the surface (inside and outside of casing). Leave at least 100’ cement in the casing for each plug.
3) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete.
|