Engineer | Form: (02 ) 2389116 5/24/2013 | Prior to recomplete, operator must: 1) Verify existing cement with a cement bond log. 2) If it is not present as follows, provide remedial cement from 720’ into the surface casing shoe. Verify remedial cement coverage with cement bond log. |