| Construction | Form: (02 ) 400163827 6/16/2011 | Certificate to Discharge Under CDPS General Permit No. COR-03000
Stormwater Discharges Associated with Construction Certification No. COR03C483. A
Field Wide Stormwater Management Plan (SWMP) for the La Plata lnfill Program is on
file at the XTO Energy Inc. office. A Site Specific SWMP
with a Site Plan will be developed for each location. Inspections of the project site and
maintenance of BMP's installed shall be conducted in accordance with the CDPHE
CDPS permit & field wide plan. Spill Prevention and Counter Measures (SPCC) for the
La Plata lnfill Program is on file at the XTO Energy Inc. office. The Field SWMP and
Site Specific SWMP each address SPCC during construction operations. |