| Engineer | Form: (02) 400088575 09/21/2010 | There is a PA well within a ¼ mile of this proposed well. To finish my review of the APD, a PA risk assessment is required.
Refer to Cause 112 - Order 185 |
| Agency | Form: (02) 400088575 09/27/2010 |
1)Provide 48 hour notice of spud to COGCC field inspector Leslie Melton (970) 375-6419 or les.melton@state.co.us
2)Provide cement coverage of production casing from TD to surface. Verify cement coverage with Cement Bond Log.
3)Run and submit Directional Survey from TD to kick-off point
4)The operator shall comply with Rule 321, and it shall be the operator’s responsibility to ensure that the well bore complies with setback requirements in Commission orders and/or rules prior to producing the well.
5)Sample and test two closest water wells within 1/2 mile swath of the directional wellbore.
6)Operators are required to obtain a bottom hole pressure utilizing a bottom hole gauge after a minimum 48 hour shut-in period following completion and prior to sales
7)Comply with all applicable provisions of Order 112-185
|
| Engineer | Form: (02) 400088575 09/27/2010 | THE PA ASSESSMENT HAS BEEN RECEIVED AND REVIEWED AND APPROVED. |