TypeSource DocumentConditions of Approval
EngineerForm: (02)
401070741
08/17/2016
1)Operator shall comply with the most current revision of the Northwest Notification Policy. 2) Operator shall provide cement coverage from the production casing shoe (7" First String) to a minimum of 200' above the surface casing shoe to provide full isolation of the Coalmont Formation. Verify production casing cement coverage with a cement bond log.
EngineerForm: (04)
401316281
06/27/2017
1) Operator shall comply with the most current revision of the Northwest Notification Policy. 2) Operator shall provide cement coverage from the intermediate casing shoe (9 5/8" First String) to a minimum of 200' above the surface casing shoe to provide full isolation of the Coalmont Formation. Verify intermediate casing cement coverage with a cement bond log.
UICForm: (04)
401386347
08/24/2017
Operator required to file a Form 2 for a Recomplete and Forms 31, 33, and 26 if they decide to convert the well to UIC Disposal well. These forms must be approved prior to injection for disposal purposes.
PermitForm: (04)
401386347
08/25/2017
Operator shall submit a Form 4 - Report of Work Done, Other: Pressure Test Results to document and report results of pressure tests and to document any cement squeeze of perfs (attach cement job summary). Operator shall submit a Form 5A to document all perfs and formation status.
UICForm: (02)
401480283
02/01/2018
1. Injection is not authorized until approval of Subsequent Forms 31 and 33. 2. Retrieve water sample(s) from injection zone(s) before stimulating formation. Samples must be analyzed for Total Dissolved Solids at a minimum. 3. PRIOR TO PERFORMING OPERATIONS: Approval of Form 4 is required for acid and fracturing jobs. (New as of 4/13/2016). 4. PRIOR TO PERFORMING OPERATIONS: Operator is required to contact COGCC to discuss Step Rate Test or Injectivity Test criteria for Maximum Surface Injection Pressure determination. Prior approval of Form 4 is required for step rate and injectivity tests. 5. For ALL NEW DRILL UNDERGROUND INJECTION WELLS a suite of open-hole Resistivity/Gamma Ray and Density/Neutron logs IS REQUIRED from Surface Casing shoe to TD. A PDF, TIFF, or PDS visual image and a LAS or DLIS file version of each log is required. 6. For all new and converted Underground Injection Control wells a Cement Bond Log (CBL) is required on the cased portions of the hole from the bottom of the casing to the top of the next shallower casing string for all casing strings other than the Surface Casing. Only a PDF, TIFF, or PDS visual image is required. 7. Operator must provide all tops of formations encountered from surface to TD on the Form 5 when submitted.
OGLAForm: (02)
401480283
04/13/2018
Operator will use qualified containment devices for all appropriate chemicals/hazardous materials and injection equipment (pumps) used onsite during the operation of the injection well. All tanks and aboveground vessels containing fluids must have secondary containment structures. All secondary containment structures/areas must be lined. Operator must ensure a minimum of 110 percent secondary containment for the largest structure containing fluids within each bermed area at the facility during operations. The construction and lining of the secondary containment structures/areas shall be supervised by a professional engineer or their agent. Operator shall equip and maintain on all tanks an electronic fluid level monitoring device.
EngineerForm: (02)
401480283
07/05/2018
1)Operator shall comply with the most current revision of the Northwest Colorado Notification Policy. 2) Within 30 days of approval of this Form 2, operator is to provide a conclusive, written demonstration with attached exhibits on a Sundry Notice using drilling records, bradenhead pressures, logs, water well records and/or any offset oil & gas well records to demonstrate that fluids (oil, gas, and water) and coal seams are adequately isolated to prevent cross-zone migration. If the demonstration is acceptable, the Condition of Approval requiring full isolation of the Coalmont will be waived. Operator is to monitor the bradenhead of the well and perform a Bradenhead Test and report on a Form 17 if the bradenhead pressure exceeds 50 psi. Bradenhead tests reported on a Form 17 will be required annually if the pressure continues to exceed 50 psi.
EngineerForm: (04)
401769402
09/21/2018
Correct Form 7 reporting within 30 days.
UICForm: (04)
401945582
03/20/2019
Operator required to collect water samples from Frontier Formation prior to acidizing. Sample collection is not listed in Summary but is discussed in Steps 17 and 18. Minimize injection volume during set up to get best quality formation water sample.
UICForm: (02)
401945935
03/20/2019
Operator required to collect water samples from Frontier Formation prior to acidizing. Sample collection is not listed in Summary but is discussed in Steps 17 and 18. Minimize injection volume during set up to get best quality formation water sample. This is an injectivity test only. No injection for disposal or enhanced recovery without approved Form 31 and 33 for Frontier.
EngineerForm: (02)
401945935
04/01/2019
Operator shall comply with the most current revision of the Northwest Notification Policy.
UICForm: (04)
402084796
07/01/2019
Operator approved to run injectivity test of the Frontier Formation through perforations from 7620 to 7686 ft MD. The maximum injection pressure of 1530 psi and maximum injected volume of 172,800 barrels. Test shall be limited to 30 days from start of test.
UICForm: (02)
402063676
12/16/2019
1. Injection is not authorized until Subsequent Forms 31 and 33 are approved. 2. Retrieve water sample(s) from injection zone(s) before stimulating formation. Samples must be analyzed for Total Dissolved Solids at a minimum. 3. PRIOR TO PERFORMING OPERATIONS: Operator is required to contact COGCC to discuss acid and fracturing jobs. Approval of Form 4 may be required for acid and fracturing jobs. (As of 4/13/2016) 4. PRIOR TO PERFORMING OPERATIONS: Operator is required to contact COGCC to discuss Step Rate Test or Injectivity Test criteria for Maximum Surface Injection Pressure determination. Prior approval of Form 4 may be required for step rate and injectivity tests. 5. Operator must provide all tops of formations encountered from surface to TD on a Form 5 if one is needed or on a Sundry. 6. Well must pass MIT witnessed by COGCC before Subsequent Forms 31 and 33 will be approved. Well in must be in injection configuration. 7. Operator must have approved eForm version(s) of Form 26(s) on file before Form 31-Subsequent and Form 32-Subsequent will be approved. Operator is required to file Form 26 updates on a quarterly basis if they have wells that need to be added or deleted.
EngineerForm: (02)
402063676
06/24/2020
1) Operator shall comply with the most current revision of the Northwest Colorado Notification Policy. 2) Following recompletion and within 30 days of commencing injection, operator will peform a bradenhead test and submit results within 10 days on a Form 17.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Drilling/Completion OperationsForm: (02 )
401070741
9/26/2016
Open-hole Resistivity Log with Gamma Ray Log will be run from TD into the surface casing. A Cement Bond Log with Gamma-Ray will be run on production casing, or on intermediate casing if a production liner is run. The Form 5, Completion Report, will list all logs run and have those logs attached.
Drilling/Completion OperationsForm: (02 )
401480283
7/8/2018
Open-hole Resistivity Log with Gamma Ray Log and Cement Bond Logs with Gamma-Ray were previously run and were attached to the Form 5, Completion Report which is linked as a related form.
Drilling/Completion OperationsForm: (02 )
401945935
4/5/2019
Open-hole Resistivty Log with Gamma Ray Log and Cement Bond Log with Gamma-Ray were previously run and submitted to COGCC.
Drilling/Completion OperationsForm: (02 )
402063676
1/8/2021
Open-hole Resistivity Log with Gamma Ray Log and Cement Bond Log with Gamma-Ray were previously run and submitted to COGCC.