WELL05-057-06582Peters 0781
13-13H12
FULCRUM ENERGY OPERATING LLC
10805
PR
9/1/2024
NORTH PARK HORIZONTAL NIOBRARA
60120
JACKSON  057
LOT4 18 7N80W 6
447512View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02)
401077934
08/24/2016
1)Operator shall comply with the most current revision of the Northwest Notification Policy. 2) Operator shall provide cement coverage from the production casing shoe (5 1/2" First String) to a minimum of 200' above the surface casing shoe to provide full isolation of the Coalmont Formation. Verify production casing cement coverage with a cement bond log.
EngineerForm: (04)
401512737
02/01/2018
1)A copy of this sundry shall be posted at the wellsite with the previously approved permit to drill. 2) Oil-based drilling fluid is to be used only after all fresh water aquifers are covered. 3) See Form 2 Conditions of Approval for cement top requirement.
EngineerForm: (04)
401673477
07/25/2018
1) A copy of this sundry shall be posted at the wellsite with the previously approved permit to drill and previously approved changes to the drilling plan by sundry. 2) Operator shall comply with the most current revision of the Northwest Notification Policy. 3) Oil-based drilling fluid is to be used only after all fresh water aquifers are covered. 4) Operator shall provide cement coverage from the production casing shoe (5 1/2" First String) to a minimum of 200' above the surface casing shoe to provide full isolation of the Coalmont Formation. Verify production casing cement coverage with a cement bond log. 5) Operator acknowledges the proximity of the listed non-operated wells. Operator assures that this offset list will be remediated per the Horizontal Offset Policy (option 4). Operator will submit a Form 42 (“OTHER – AS SPECIFIED BY PERMIT CONDITION”) stating that appropriate mitigation will be completed, during the hydraulic stimulation of this well. This Form 42 shall be filed 48 hours prior to stimulation. Operator will assure that the well’s Bradenhead is open and monitored during the entire stimulation treatment – a person will monitor for any evidence of fluid, a Bradenhead test will be performed prior to the beginning of stimulation. HEBRON 02-07H (API 05-057-06499) Peters 0781 16-12H13 (API 05-057-06597) Hebron 3-12H (API 05-057-06498)
EngineerForm: (04)
401900169
03/07/2019
1) Comply with all requirements of Rule 912, including monthly reporting of flared volumes (on Form 7) and notifications to local emergency dispatch or the local government designee. 2) Submit annual updates (requests to flare) to COGCC on Form 4s (Sundry Notices), including all information specified in COGCC’s "Notice to Operators, Rule 912 Venting or Flaring Produced Natural Gas - Statewide." 3) Comply with any Colorado Department of Public Health and Environment, Air Pollution Control Division rules or requirements for all atmospheric discharges. 4) An enclosed flare shall be used, unless an open flare is specifically allowed by CDPHE’s Regulation 7. 5) With the next annual update (request to flare), collect a new gas sample for laboratory analysis including hydrogen sulfide and submit a Form 43 to upload the laboratory results to the COGCC Environmental Database. Form 43 instructions are on COGCC’s website under Regulation => Forms => Form 43 COGCC Environmental Database.
EngineerForm: (04)
402293128
02/12/2020
1) Comply with all requirements of Rule 912, including monthly reporting of flared volumes (on Form 7) and notifications to local emergency dispatch or the local government designee. 2) Submit annual updates (requests to flare) to COGCC on Form 4s (Sundry Notices), including all information specified in COGCC’s "Notice to Operators, Rule 912 Venting or Flaring Produced Natural Gas - Statewide." Next sundry request due 1/23/2021. 3) Comply with any Colorado Department of Public Health and Environment, Air Pollution Control Division rules or requirements for all atmospheric discharges. 4) An enclosed flare shall be used, unless an open flare is specifically allowed by CDPHE’s Regulation 7. 5) With the next annual update (request to flare), collect a new gas sample for laboratory analysis including hydrogen sulfide and submit a Form 43 to upload the laboratory results to the COGCC Environmental Database. Form 43 instructions are on COGCC’s website
EngineerForm: (04)
402522830
01/27/2021
Following the anticipated acquisition of certain assets owned and operated by SandRidge Energy in Jackson County, Colorado, SandRidge acknowledges Gondola Resources plans to modify SandRidge’s pending Gas Capture Plan for the Peters 0781 13-13H12 well and the four additional wells on the Open Range Pad. Gondola will install a JT Unit and one natural gas-powered CAT driven 400 KW generator at the Open Range Pad and use natural gas from the wells to power the engines on the pad. This work is expected to commence in the Spring of 2021 and conclude in the Summer of 2021. Remaining gas volumes will be routed to the Big Horn Pad where Gondola will be installing a mobile data center and energy intensive computing facilities located on the Bighorn Pad. Gondola anticipates this arrangement to be deployed and operational by year end.
EngineerForm: (04)
402522830
01/29/2021
1) Flaring of natural gas shall comply with COGCC Rule 903. 2) Report metered volumes on Form 7, Operator’s Monthly Report of Operations for gas flared, sold or used on location. 3) The operator is required to obtain and maintain any required air permits from CDPHE. 4) The expectation for permanent flares controlling separators or residual gas will be an enclosed combustion device with a 98% design destruction efficiency for hydrocarbons. Operator shall manage this well so that production volumes do not exceed the combustor capacity. 5) Operator is to provide prior notification to the local emergency dispatch or the local governmental designee of any flaring or venting event. Operator shall have an approved a Gas Capture Plan or have sought and received a variance from the COGCC Commission for continued production without gas infrastructure, prior to January 15, 2022 or wells must be shut in by January 15, 2022.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Drilling/Completion OperationsForm: (02 )
401077934
9/7/2016
One of the first wells drilled on the pad will be logged with openhole Resistivity Log and Gamma Ray Log from the kick-off point into the surface casing. All wells on the pad will have a cement bond log with gamma-ray run on production casing (or on intermediate casing if production liner is run) into the surface casing. The horizontal portion of every well will be logged with a measured-while-drilling gamma-ray log. The Form 5, Completion Report, for each well on the pad will list all logs run and have those logs attached. The Form 5 for a well without open-hole logs shall clearly state “No open-hole logs were run” and shall clearly identify (by API#, well name & number) the well in which openhole logs were run.