Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-057-06567Pintail SWD 0780
3-16D
FULCRUM ENERGY OPERATING LLC
10805
SO
12/1/2020
WILDCAT
99999
JACKSON  057
SESW 16 7N80W 6
446527View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02)
401054345
06/22/2016
1)Operator shall comply with the most current revision of the Northwest Notification Policy. 2) Operator shall provide cement coverage from the production casing shoe (5+1/2" First String) to a minimum of 200' above the surface casing shoe to provide full isolation of the Coalmont Formation. Verify production casing cement coverage with a cement bond log.
EnvironmentalForm: (04)
401135685
11/23/2016
The operator has informed COGCC that any stockpiled cuttings will be removed or in their final disposition by July 2017.
EnvironmentalForm: (04)
401135685
11/23/2016
All stockpiled material shall have proper stormwater BMP’s, to prevent the migration of soil.
EngineerForm: (02)
401457438
11/21/2017
1)Operator shall comply with the most current revision of the Northwest Notification Policy. 2) Oil-based drilling fluid is to be used only after all fresh water aquifers are covered. 3) Operator shall provide cement coverage from the production casing shoe (7" First String) to a minimum of 200' above the surface casing shoe to provide full isolation of the Coalmont Formation. Verify production casing cement coverage with a cement bond log.
UICForm: (02)
401457438
11/21/2017
1. Injection is not authorized until approval of Subsequent Forms 31 and 33. 2. PRIOR TO PERFORMING OPERATIONS: Operator is required to contact COGCC to discuss Step Rate Test or Injectivity Test criteria for Maximum Surface Injection Pressure determination. Prior approval of Form 4 is required for step rate and injectivity tests. 3. PRIOR TO PERFORMING OPERATIONS: Approval of Form 4 is required for acid and fracturing jobs. (New as of 4/13/2016). 4. Retrieve water sample(s) from injection zone(s) before stimulating formation. Samples must be analyzed for Total Dissolved Solids at a minimum. 5. For ALL NEW DRILL UNDERGROUND INJECTION WELLS a suite of open-hole Resistivity/Gamma Ray and Density/Neutron logs IS REQUIRED from Surface Casing shoe to TD. A PDF, TIFF, or PDS visual image and a LAS or DILS file version of each log is required. 6. See Drilling/Completion Ops COA #3 for cement requirements and requirement to run CBL. 7. Operator must provide all tops of formations encountered from surface to TD on the Form 5 when submitted.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Drilling/Completion OperationsForm: (02 )
401054345
7/22/2016
One of the first wells drilled on the pad will be logged with open-hole Resistivity Log and Gamma Ray Log from the kick-off point into the surface casing. All wells on the pad will have a cement bond log with gamma-ray run on production casing (or on intermediate casing if production liner is run) into the surface casing. The horizontal portion of every well will be logged with a measured-while-drilling gamma-ray log. The Form 5, Completion Report, for each well on the pad will list all logs run and have those logs attached.The Form 5 for a well without open-hole logs shall clearly state “No open-hole logs were run” and shall clearly identify (by API#, well name & number) the well in which open-hole logs were run.