WELL05-057-06553Hebron
0780 4-18
FULCRUM ENERGY OPERATING LLC
10805
PR
3/1/2022
NORTH PARK HORIZONTAL NIOBRARA
60120
JACKSON  057
NWNW 17 7N80W 6
324757View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02)
400959455
01/08/2016
1) Operator shall comply with the most current revision of the Northwest Notification Policy. 2) Operator shall provide cement coverage from the production casing shoe (5+1/2" First String) to a minimum of 200' above the surface casing shoe to provide full isolation of the Coalmont Formation. Verify production casing cement coverage with a cement bond log. Changed First String cement top from a null value to 2300' (200' above proposed surface casing shoe depth of 2500').
EngineerForm: (02)
400984089
02/17/2016
1) Operator shall comply with the most current revision of the Northwest Notification Policy. 2) Additional 200' plugs required in open hole with the base of the first plug at the Frontier top and the base of the second plug at the Niobrara top. Operator proposes to set a third plug near the lateral kickoff point from 4425' to 3925' (above Sussex Formation, expected at approximately 4828'). Open hole plugs shall be set prior to drilling the lateral sidetrack wellbore.
PermitForm: (02)
400984089
02/23/2016
317.p Open-hole Resistivity Log with Gamma Ray Log will be run from TD into the surface casing. A Cement Bond Log with Gamma-Ray will be run on production casing, or on intermediate casing if a production liner is run. The Form 5, Completion Report, will list all logs run and have those logs attached.
EngineerForm: (04)
401147155
11/22/2016
1) Comply with all requirements of Rule 912, including monthly reporting of flared volumes (on Form 7) and notifications to local emergency dispatch or the local government designee. 2) Submit annual updates (requests to flare) to COGCC on Form 4s (Sundry Notices),including all information specified in COGCC’s "Notice to Operators, Rule 912 Venting or Flaring Produced Natural Gas - Statewide." 3) Comply with any Colorado Department of Public Health and Environment, Air Pollution Control Division rules or requirements for all atmospheric discharges. 4) An enclosed flare shall be used, unless an open flare is specifically allowed by CDPHE’s Regulation 7.
OGLAForm: (04)
401010493
05/23/2017
COA 11 - A closed loop system must be implemented during drilling (as indicated on the Form 2 and Form 2A). All cuttings generated during drilling with oil based mud (OBM) must be segregated from water/bentonite based mud-(WBM-) generated drill cuttings and placed separately on the well pad. All OBM-generated drill cuttings must be kept in tanks/containers, or placed on a lined/bermed portion of the well pad; prior to disposition. The moisture content of any OBM-generated drill cuttings in a tank, cuttings containment area, or pile shall be as low as practicable to prevent accumulation of liquids greater than de minimis amounts. The operator has indicated that ‘Cuttings Disposal’ will be “OFFSITE” and that the ‘Cuttings Disposal Method’ will be “COMMERCIAL DISPOSAL” (as shown in the ‘DRILLING WASTE MANAGEMENT PROGRAM SECTION’ of the Form 2A). All liners associated with oil-based drilling mud and OBM-generated drill cuttings must be disposed of offsite per CDPHE rules and regulations. Any changes to drill cuttings management and disposal at this location will require submittal (via a Form 4 Sundry Notice) and approval of a Waste Management Plan detailing the changes (specifying cuttings characterization methods, cuttings management, amendment, and onsite disposal location[s]). COA 12 - The moisture content of water/bentonite-based mud (WBM) generated cuttings during drilling of the surface casing intervals, that will be managed onsite, shall be kept as low as practicable to prevent accumulation of liquids greater than de minimis amounts. After drilling and completion operations have been completed, any of the WBM drill cuttings that will remain on the well pad location (cuttings management area, the cut portion of the pad, cuttings trench, dry cuttings drilling pit), must meet the applicable standards of Table 910-1. No offsite disposal of cuttings to another oil and gas location shall occur without prior approval of a Waste Management Plan (submitted via a Form 4 Sundry Notice) specifying disposal location and waste characterization method. Operator has indicated that commercial disposal of cuttings will be the method of disposal for all drill cuttings.
EngineerForm: (04)
401423649
10/17/2017
1) Comply with all requirements of Rule 912, including monthly reporting of flared volumes (on Form 7) and notifications to local emergency dispatch or the local government designee. 2) Submit annual updates (requests to flare) to COGCC on Form 4s (Sundry Notices),including all information specified in COGCC’s "Notice to Operators, Rule 912 Venting or Flaring Produced Natural Gas - Statewide." 3) Comply with any Colorado Department of Public Health and Environment, Air Pollution Control Division rules or requirements for all atmospheric discharges. 4) An enclosed flare shall be used, unless an open flare is specifically allowed by CDPHE’s Regulation 7. 5) With next years annual update (request to flare), collect a new gas sample including hydrogen sulfide and submit an Electronic Data Deliverable (EDD), prepared by the laboratory that performed the gas analysis. The EDD shall be submitted with the annual update, in the format specified on COGCC’s website, located in Help => Environmental => COGCC EDD Information.
EngineerForm: (04)
401833535
03/06/2019
1) Comply with all requirements of Rule 912, including monthly reporting of flared volumes (on Form 7) and notifications to local emergency dispatch or the local government designee. 2) Submit annual updates (requests to flare) to COGCC on Form 4s (Sundry Notices), including all information specified in COGCC’s "Notice to Operators, Rule 912 Venting or Flaring Produced Natural Gas - Statewide." 3) Comply with any Colorado Department of Public Health and Environment, Air Pollution Control Division rules or requirements for all atmospheric discharges. 4) An enclosed flare shall be used, unless an open flare is specifically allowed by CDPHE’s Regulation 7. 5) With the next annual update (request to flare), collect a new gas sample for laboratory analysis including hydrogen sulfide and submit a Form 43 to upload the laboratory results to the COGCC Environmental Database. Form 43 instructions are on COGCC’s website under Regulation => Forms => Form 43 COGCC Environmental Database.
EngineerForm: (04)
402292815
02/12/2020
1) Comply with all requirements of Rule 912, including monthly reporting of flared volumes (on Form 7) and notifications to local emergency dispatch or the local government designee. 2) Submit annual updates (requests to flare) to COGCC on Form 4s (Sundry Notices), including all information specified in COGCC’s "Notice to Operators, Rule 912 Venting or Flaring Produced Natural Gas - Statewide." Next sundry request due 1/23/2021. 3) Comply with any Colorado Department of Public Health and Environment, Air Pollution Control Division rules or requirements for all atmospheric discharges. 4) An enclosed flare shall be used, unless an open flare is specifically allowed by CDPHE’s Regulation 7. 5) With the next annual update (request to flare), collect a new gas sample for laboratory analysis including hydrogen sulfide and submit a Form 43 to upload the laboratory results to the COGCC Environmental Database. Form 43 instructions are on COGCC’s website
EngineerForm: (04)
402568827
01/27/2021
Following the anticipated acquisition of certain assets owned and operated by SandRidge Energy in Jackson County, Colorado, SandRidge acknowledges Gondola Resources plans to modify SandRidge’s pending Gas Capture Plan for the HEBRON 0780 4-18H well and the six additional wells on the Mutual Pad. Gondola will install one natural gas-powered CAT driven 400 KW generator at the Mutual Pad and use natural gas from the wells to power the engines on the pad. This work is expected to commence in the Spring of 2021 and conclude in the Summer of 2021. Remaining gas volumes will be routed to the Big Horn Pad where Gondola will be installing a mobile data center and energy intensive computing facilities located on the Bighorn Pad. Gondola anticipates this arrangement to be deployed and operational by year end.
EngineerForm: (04)
402568827
01/29/2021
1) Flaring of natural gas shall comply with COGCC Rule 903. 2) Report metered volumes on Form 7, Operator’s Monthly Report of Operations for gas flared, sold or used on location. 3) The operator is required to obtain and maintain any required air permits from CDPHE. 4) The expectation for permanent flares controlling separators or residual gas will be an enclosed combustion device with a 98% design destruction efficiency for hydrocarbons. Operator shall manage this well so that production volumes do not exceed the combustor capacity. 5) Operator is to provide prior notification to the local emergency dispatch or the local governmental designee of any flaring or venting event. Operator shall have an approved a Gas Capture Plan or have sought and received a variance from the COGCC Commission for continued production without gas infrastructure, prior to January 15, 2022 or wells must be shut in by January 15, 2022.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Drilling/Completion OperationsForm: (02 )
400984089
3/1/2016
This well will be on a pad with multiple wells and one of the first wells drilled on the pad will be logged with an open-hole resistivity log and gamma ray log from the kick-off point into the surface casing. All wells on the pad will have a cement bond log with gamma ray on production casing or on intermediate casing if production liner is ran. The form 5, Completion report, for this well will list all logs run and will have logs attached.
Drilling/Completion OperationsForm: (02 )
400959455
3/1/2016
One of the first wells drilled on the pad will be logged with open-hole Resistivity Log and Gamma Ray Log from the kick-off point into the surface casing. All wells on the pad will have a cement bond log with gamma-ray run on production casing (or on intermediate casing if production liner is run) into the surface casing. The horizontal portion of every well will be logged with a measured-while-drilling gamma-ray log. The Form 5, Completion Report, for each well on the pad will list all logs run and have those logs attached. The Form 5 for a well without open-hole logs shall clearly state “No open-hole logs were run” and shall clearly identify (by API#, well name & number) the well in which open-hole logs were run.