WELL05-045-22781YATER
43D-18-07-95
TEP ROCKY MOUNTAIN LLC
96850
PR
6/14/2015
PARACHUTE
67350
GARFIELD  045
NWSW 17 7S95W 6
159652View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02)
400721552
11/25/2014
1)Operator shall comply with the most current revision of the Northwest Colorado Notification Policy. See attached notice. 2)Operator shall comply with the most current revision of the Garfield County Rulison Field Notice to Operators, with the following exception: all field notice requirements specified in this notice to operators are superseded by the requirements of the most current revision of the Northwest Colorado Notification Policy (see condition of approval #1). See attached notice. 3)Operator shall provide cement coverage from the production casing shoe (4+1/2" FIRST STRING) to a minimum of 200' above all Mesa Verde Group (and Ohio Creek Formation, if present) oil, gas, and water-bearing sandstone and coalbed formations. Verify production casing cement coverage with a cement bond log. 4)The Operator shall monitor the bradenhead pressure of all wells listed below within 300 feet of the well which is to be treated, provided such other wells penetrate the productive zone which is to be treated. The Operator shall install bradenhead pressure gauges on their respective wells at least 24 hours prior to the Operator initiating a Treatment. The Operator shall monitor their respective gauges at least once during every 24-hour period until 24 hours after the Treatment is completed and shall continue to do so until the pressure stabilizes with allowance for a ten percent daily fluctuation. The bradenhead pressure gauges shall be capable of monitoring current pressure and also capable of recording the maximum pressure encountered in a 24 hour period. Such gauges shall be reset between each 24 hour period. The pressures shall be recorded and saved for a period of one year. Alternate electronic measurement may be used to record the prescribed pressures. If at any time during the Treatment or the 24-hour post-stimulation period, the bradenhead annulus pressure of the Treatment well or any offset wells increases by more than 200 psig, the Operator shall verbally notify the Director, as soon as practicable, but no later than twenty-four (24) hours following such incident. Within fifteen (15) days after the occurrence, the Operator shall submit a Sundry Notice, Form 4, giving all details, including corrective actions taken. BAT 44A-18-07-95 (API#045-19089)
PermitForm: (02)
400721552
12/10/2014
Operator shall comply with Buffer Zone Move-In, Rig-Up Notice Policy dated 12-16-2013
PermitForm: (02)
400721552
12/10/2014
Open hole resistivity and gamma logs shall be run to describe the stratigraphy of the entire well bore and to adequately verify the setting depth of surface casing and aquifer coverage. On a multi-well pad, these open hole logs are only required on one of the first wells drilled on the pad and the Drilling Completion Report - Form 5 for every well on the pad shall identify which well was logged.
EngineerForm: (05)
400840112
10/02/2015
operator reported that "CBL,MUD, PULSED NEUTRON. OPEN HOLE LOGS WERE RUN FOR THIS PAD ON THE YATER 12D-17-07-95 WELL (API # 05-045-22761)." a separate CBL has to be run for each separate well. The CBL for that well DOES NOT apply to THIS well! JK edited the "logs run" section of the drilling tab to remove "CBL"
 
COGIS - Best Management Practice Results
No records to display.