| Engineer | Form: (02) 400661679 08/27/2014 | 1)Operator shall comply with the most current revision of the Northwest Colorado Notification Policy. See attached notice.
2)Operator shall comply with the most current revision of the Garfield County Rulison Field Notice to Operators, with the following exception: all field notice requirements specified in this notice to operators are superseded by the requirements of the most current revision of the Northwest Colorado Notification Policy (see condition of approval #1). See attached notice.
3)Operator shall provide cement coverage from the production casing shoe (4+1/2" FIRST STRING) to a minimum of 200' above all Mesa Verde Group (and Ohio Creek Formation, if present) oil, gas, and water-bearing sandstone and coalbed formations. Verify production casing cement coverage with a cement bond log. |
| Agency | Form: (02) 400661679 11/04/2014 | No anti-collision has been provided for this well and the 422-11, but comparing the Dev. Drilling Plan thay are over 100' apart.
Final review complete. |
| Engineer | Form: (02) 401131296 10/31/2016 | 1)Operator shall comply with the most current revision of the Northwest Colorado Notification Policy. See attached notice.
2)Operator shall comply with the most current revision of the Garfield County Rulison Field Notice to Operators, with the following exception: All field notice requirements specified in that Notice to Operators are superseded by the requirements of the most current revision of the Northwest Colorado Notification Policy (see Condition of Approval #1).
3)Operator shall provide cement coverage from the production casing shoe (4+1/2" FIRST STRING) to a minimum of 200' above all Mesa Verde Group (and Ohio Creek Formation, if present) oil, gas, and water-bearing sandstone and coalbed formations. Verify production casing cement coverage with a cement bond log. |
| Permit | Form: (02) 401131296 12/27/2016 | If conductors are preset, operator shall comply with Notice to Operators: Procedures for Preset Conductors (dated September 1, 2016, revised October 6, 2016). |
| Permit | Form: (02) 401131296 12/28/2016 | Spacing Order 510-9 does not create a unit for these lands. Therefore distance to unit boundary, unit acreage, and unit configuration have been removed with operator approval.
Final review complete. |