| Engineer | Form: (02) 400671990 09/15/2014 | (1) COMPLIANCE WITH THE MOST CURRENT REVISION OF THE NORTHWEST COLORADO NOTIFICATION POLICY IS REQUIRED. SEE ATTACHED NOTICE.
(2) COMPLIANCE WITH THE MOST CURRENT REVISION OF THE GARFIELD COUNTY RULISON FIELD NOTICE TO OPERATORS IS REQUIRED, WITH THE FOLLOWING EXCEPTION: ALL FIELD NOTICE REQUIREMENTS SPECIFIED IN
THIS NOTICE TO OPERATORS ARE SUPERSEDED BY THE REQUIREMENTS OF THE MOST CURRENT REVISION OF THE NORTHWEST COLORADO NOTIFICATION POLICY (SEE CONDITION OF APPROVAL #1). SEE ATTACHED NOTICE.
(3) CEMENT ON 1ST STRING ("PRODUCTION") CASING MUST BE A MINIMUM OF 200' ABOVE THE TOP OF THE MESA VERDE FORMATION (OR 200' ABOVE THE OHIO CREEK FORMATION IF PRESENT). CEMENT TOP VERIFICATION BY CBL IS REQUIRED.
(4) APPROVAL OF THIS FORM DOES NOT AUTHORIZE INJECTION. AUTHORIZATION TO INJECT REQUIRES APPROVAL OF FORM 31 AND FORM 33.
(5) BEFORE STIMULATING THE OBJECTIVE INJECTION FORMATION(S), COLLECT WATER SAMPLE(S) AND ANALYZE FOR TOTAL DISSOLVED SOLIDS. PRIOR APPROVAL OF FORM 4 IS REQUIRED FOR STEP RATE AND INJECTIVITY TESTS.
(6) A STEP RATE TEST TO DETERMINE FRACTURE PRESSURE IS PERMISSIBLE BEFORE APPROVING FORMS 31 AND 33, BUT MUST BE GIVEN COGCC APPROVAL PRIOR TO CONDUCTING THE TEST. THE TEST VOLUME MUST NOT EXCEED 10,000 BBLS AND THE DURATION MUST NOT EXCEED 10 DAYS.
|
| Permit | Form: (02) 400671990 10/27/2014 | Open hole resistivity and gamma logs shall be run to describe the stratigraphy of the entire well bore and to adequately verify the setting depth of surface casing and aquifer coverage. On a multi-well pad, these open hole logs are only required on one of the first wells drilled on the pad and the Drilling Completion Report - Form 5 for every well on the pad shall identify which well was logged.
|
| Permit | Form: (02) 400671990 10/27/2014 | Operator shall comply with Buffer Zone Move-In, Rig-Up Notice Policy dated 12-16-2013.
|
| Engineer | Form: (02) 401106591 09/27/2016 | 1) Operator shall comply with the most current revision of the Northwest Notification Policy.
2) Operator shall comply with the most current revision of the Garfield County Rulison Field Notice to Operators, with the following exception: All field notice requirements specified in that Notice to Operators are superseded by the requirements of the most current revision of the Northwest Colorado Notification Policy (see Condition of Approval #1).
3) Operator shall provide cement coverage from the production casing shoe (4+1/2" FIRST STRING) to a minimum of 200' above all Mesaverde Group (and Ohio Creek Formation, if present) oil, gas, and water-bearing sandstone and coalbed formations. Verify production casing cement coverage with a cement bond log. |
| UIC | Form: (02) 401106591 10/07/2016 | 1.Injection is not authorized until approval of Subsequent Forms 31 and 33.
2.Prior to performing operations, Operator is required to contact COGCC to discuss Step Rate Test or Injectivity Test criteria for Maximum Surface Injection Pressure determination. Prior approval of Form 4 is required for step rate and injectivity tests.
3.Prior to performing operations approval of Form 4 is required for acid and fracturing jobs. (New as of 4/13/2016).
4.Retrieve water sample(s) from injection zone(s) before stimulating formation. Samples must be analyzed for Total Dissolved Solids at a minimum.
5.For ALL NEW DRILL UNDERGROUND INJECTION WELLS a suite of open-hole Resistivity/Gamma Ray and Density/Neutron logs IS REQUIRED from Surface Casing shoe to TD. A PDF, TIFF, or PDS visual image and a LAS or DILS file version of each log is required. LOGS FROM ADJACENT PRODUCTION WELLS ON PAD ARE NOT ACCEPTABLE.
6.For all new and converted Underground Injection Control wells a Cement Bond Log (CBL) is required on the cased portions of the hole from the bottom of the casing to the top of the next shallower casing string for all casing strings other than the Surface Casing. Only a PDF, TIFF, or PDS visual image is required.
7.Operator must provide all tops of formations encountered from surface to TD on the Form 5 when submitted.
|
| Environmental | Form: (04) 401692300 07/05/2018 | Spill/Release Point #448546 remains active at the subject location, though work to remediate impacts was concluded under Remediation Project #10074. Operator shall submit an eForm 19 Supplemental Report to request closure of Spill/Release Point #448546 that includes a definitive statement of Root Cause and reference to Remediation Project #10074, prior to commencement of further construction activity. |
| UIC | Form: (04) 401692300 07/05/2018 | Operator must ensure secondary containment for any volume of fluids contained at well site during drilling and completion operations; including, but not limited to, construction of a berm or diversion dike, diversion/collection trenches within and/or outside of berms/dikes, site grading, or other comparable measures (i.e., best management
practices (BMPs) associated with stormwater management) sufficiently protective of nearby surface water. Any berm constructed at the well pad location will be stabilized, inspected at regular intervals (at least every 14 days), and maintained in good condition.
|
| UIC | Form: (04) 401692300 07/09/2018 | Operator required to continuously monitor and record tubing-casing annulus pressure and Bradenhead pressure during entire job. |
| UIC | Form: (04) 401776908 09/27/2018 | Injection test is limited to a maximum of 10,000 barrels and maximum of 10 days. |