| Engineer | Form: (02) 400480163 10/29/2013 | (1) COMPLIANCE WITH THE MOST CURRENT REVISION OF THE NORTHWEST COLORADO NOTIFICATION POLICY IS REQUIRED.
(2) COMPLIANCE WITH THE MOST CURRENT REVISION OF THE GARFIELD COUNTY RULISON-FIELD NOTICE TO OPERATORS IS REQUIRED.
(3) CEMENT ON PRODUCTION CASING MUST BE A MINIMUM OF 200’ ABOVE THE TOP OF THE MESA-VERDE FORMATION (OR 200’ ABOVE THE OHIO CREEK FORMATION IF PRESENT). CEMENT TOP VERIFICATION BY CBL IS REQUIRED.
|
| Permit | Form: (02) 400480163 01/07/2014 | Open hole resistivity and gamma logs shall be run to describe the stratigraphy of the entire wellbore and to adequately verify the setting depth of surface casing and aquifer coverage. On a multi-well pad, these open hole logs are only required on one of the first wells drilled on the pad and the Form 5 for every well on the pad shall identify which well was logged.
|
| Engineer | Form: (04) 400808231 03/27/2015 | 1) The COA requiring cement coverage 200' above the top of the Mesa Verde (or Ohio Creek if present) is waived for this well. Operator is to monitor the bradenhead and notify COGCC engineering staff if the pressure exceeds 225 psi. |