| Wildlife | Form: (02 ) 400409217 6/18/2013 | Minimize the number, length and footprint of oil & gas development roads
Use existing routes where possible
Combine utility infrastructure planning (gas, electric & water) when possible with roadway planning to avoid separate utility corridors
Coordinate Employee transport when possible
Reduce visits to well-sites through remote monitoring (i.e. SCADA) and the use of multi-function contractors. Maximize use of state-of-the-art drilling technology (e.g., high efficiency rigs, coiled-tubing unit rigs, closed-loop or pitless drilling, etc.) to minimize disturbance.
Reclaim mule deer and elk habitats with native shrubs, grasses, and forbs appropriate to the ecological site disturbed.
|
| Construction | Form: (02 ) 400409217 6/18/2013 | (Not all are used all the time)
Terminal Containment, Diversions, Run-On Protection, Tracking, Benching, Terracing, ECM (Erosion Control Mulch), ECB (Erosion Control Blanket), Check Dams, Seeding, Mulching, Water Bars, Stabilized Unpaved Surfaces (Gravel), Stormwater & Snow Storage Containment, Scheduling, Phased Construction, Temporary Flumes, Culverts with inlet & outlet protection, Rip Rap, TRM (Turf Reinforcement Mats), Maintenance, Scheduling, Phased Construction, Fueling BMP's, Waste Management BMP's, Materials Handling BMP's
|
| Pre-Construction | Form: (02 ) 400409217 6/18/2013 | Wattles, Silt Fence, Vegetation Buffers, Slash, Topsoil Windrows (diversions & ROP's), Scheduling, Phased Construction |
| Interim Reclamation | Form: (02 ) 400409217 6/18/2013 | Maintenance
Revegetation Monitoring
BMP maintenance & monitoring
Weed Management
|
| Dust control | Form: (02 ) 401047267 6/14/2016 | • Strategically apply fugitive dust control measures, including enforcing established
speed limits on Encana private roads, to reduce fugitive dust and coating of vegetation
and deposition in water sources.
|
| Drilling/Completion Operations | Form: (02 ) 401047267 6/14/2016 | • One of the first wells drilled on the pad will be logged with open-hole Resistivity Log
and Gamma Ray Log from TD into the surface casing. All wells on the pad will have a
cement bond log with gamma-ray run on production casing (or on intermediate casing
if production liner is run) into the surface casing. The Form 5, Completion Report, for
each well on the pad will list all logs run and have those logs attached. The Form 5 for
a well without open-hole logs shall clearly state “No open-hole logs were run” and shall
clearly identify (by API#, well name & number) the well in which open-hole logs were
run.
|