| Engineer | Form: (02) 400401950 04/15/2013 | (1) COMPLIANCE WITH THE MOST CURRENT REVISION OF THE NORTHWEST COLORADO NOTIFICATION POLICY IS REQUIRED.
(2) COMPLIANCE WITH THE MOST CURRENT REVISION OF THE GARFIELD COUNTY RULISON-FIELD NOTICE TO OPERATORS IS REQUIRED.
(3) PROVIDE CEMENT COVERAGE FROM THE INTERMEDIATE CASING SHOE TO A MINIMUM OF 200’ ABOVE TOP OF GAS (OR OTHER SHALLOWEST-KNOWN PRODUCING HORIZON). VERIFY CEMENT WITH A CBL.
|
| Engineer | Form: (04) 400506025 11/01/2013 | Added Temporary Abandonment details to Engineering/Environmental tab of this form, using the planned TA date of 11/5/2013. Daily report dated 9/28/2013 accepted as the Mechanical Integrity Test for this approval. However, if sidetrack does not commence by 4/30/2014, then a new TA Form 4 request will be required in addition to a formal MIT (charted or witnessed by COGCC Staff) and filed on a Form 21. This approval is not an approval to sidetrack. Operator must receive approval on a new Form 2 prior to milling a window in the casing and attempting a sidetrack of this well. |