| Engineer | Form: (02) 400321842 10/31/2012 | (1) COMPLIANCE WITH THE MOST CURRENT REVISION OF THE NORTHWEST COLORADO NOTIFICATION POLICY IS REQUIRED.
(2) COMPLIANCE WITH THE MOST CURRENT REVISION OF THE GARFIELD COUNTY RULISON-FIELD NOTICE TO OPERATORS IS REQUIRED.
(3) COMPLIANCE WITH THE MOST CURRENT REVISION OF THE MAMM CREEK FIELD NOTICE TO OPERATORS IS REQUIRED.
(4) COMPLIANCE WITH THE NOTICE TO OPERATORS DRILLING WELLS IN THE BUZZARD, MAMM CREEK, AND RULISON FIELDS, GARFIELD COUNTY AND MESA COUNTY IS REQUIRED. (PROCEDURES AND SUBMITTAL REQUIREMENTS FOR COMPLIANCE WITH COGCC ORDERS NOS. 1-107, 139-56, 191-22, AND 369-2 (JULY 8, 2010)). SEE ATTACHED NOTICE.
|
| Engineer | Form: (04) 400530227 12/20/2013 | This well is within the Mamm Creek NTO area. One requirement for wells in this NTO is for COGCC concurrence prior to well-completion. The Sundry shall also include bradenhead-pressure measurements at stipulated intervals (6 hours after production casing is cemented, also 12, 24, 48, and 72 hours) and also note the amount of fluid necessary to 'top off' the annular fluid level 'full'.
WPX shall ensure that for future completions in the M C NTO that the conditions of approval in the NTO are rigorously adhered to. |