| Engineer | Form: (02) 400320303 10/31/2012 | (1) COMPLIANCE WITH THE MOST CURRENT REVISION OF THE NORTHWEST COLORADO NOTIFICATION POLICY IS REQUIRED.
(2) COMPLIANCE WITH THE MOST CURRENT REVISION OF THE GARFIELD COUNTY RULISON-FIELD NOTICE TO OPERATORS IS REQUIRED.
(3) COMPLIANCE WITH THE MOST CURRENT REVISION OF THE MAMM CREEK FIELD NOTICE TO OPERATORS IS REQUIRED.
(4) COMPLIANCE WITH THE NOTICE TO OPERATORS DRILLING WELLS IN THE BUZZARD, MAMM CREEK, AND RULISON FIELDS, GARFIELD COUNTY AND MESA COUNTY IS REQUIRED. (PROCEDURES AND SUBMITTAL REQUIREMENTS FOR COMPLIANCE WITH COGCC ORDERS NOS. 1-107, 139-56, 191-22, AND 369-2 (JULY 8, 2010)). SEE ATTACHED NOTICE.
|
| Engineer | Form: (04) 400615360 05/30/2014 | This Sundry is a Request-to-Complete, as mandated by the Mamm Creek NTO. the RTC should include not only a CBL (and any other indications of production-string cement), a wellbore diagram with specific data -- both of which are included here -- but also a table of bradenhead-pressure measurements and record of mud volume needed to keep the hole full after completion of the primary cementing operation. In the future, the operator will include/append that data to each RTC. However, that data has been acquired, and is in the wellfiles in doc # 2122065. |