WELL05-045-21718Federal
29-1C PA29
CAERUS PICEANCE LLC
10456
AL
6/14/2018
PARACHUTE
67350
GARFIELD  045
Lot 1 29 7S95W 6
334983View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02)
400328427
09/21/2012
(1) COMPLIANCE WITH THE MOST CURRENT REVISION OF THE NORTHWEST COLORADO NOTIFICATION POLICY IS REQUIRED. (2) COMPLIANCE WITH THE MOST CURRENT REVISION OF THE GARFIELD COUNTY RULISON-FIELD NOTICE TO OPERATORS IS REQUIRED.
EngineerForm: (02)
400707889
12/29/2014
1)Operator shall comply with the most current revision of the Northwest Colorado Notification Policy. See attached notice. 2)Operator shall comply with the most current revision of the Garfield County Rulison Field Notice to Operators, with the following exception: all field notice requirements specified in this notice to operators are superseded by the requirements of the most current revision of the Northwest Colorado Notification Policy (see condition of approval #1). See attached notice. 3)Operator shall provide cement coverage from the production casing shoe (4+1/2" FIRST STRING) to a minimum of 200' above all Mesa Verde Group (and Ohio Creek Formation, if present) oil, gas, and water-bearing sandstone and coalbed formations. Verify production casing cement coverage with a cement bond log. 4)The Operator shall monitor the bradenhead pressure of well S.PARACHUTE FEDERAL #29-14 (API #045-07914) that is within 300 feet of the well which is to be treated. The Operator shall install a bradenhead pressure gauge on the well at least 24 hours prior to initiating a Treatment. The Operator shall monitor the gauge at least once during every 24-hour period until 24 hours after the Treatment is completed and shall continue to do so until the pressure stabilizes with allowance for a ten percent daily fluctuation. The bradenhead pressure gauge shall be capable of monitoring current pressure and also capable of recording the maximum pressure encountered in a 24 hour period. The gauge shall be reset between each 24 hour period. The pressures shall be recorded and saved for a period of one year. Alternate electronic measurement may be used to record the prescribed pressures. If at any time during the Treatment or the 24-hour post-stimulation period, the bradenhead annulus pressure of the Treatment well or offset well increases by more than 200 psig, the Operator shall verbally notify the Director, as soon as practicable, but no later than twenty-four (24) hours following such incident. Within fifteen (15) days after the occurrence, the Operator shall submit a Sundry Notice, Form 4, giving all details, including corrective actions taken.
PermitForm: (02)
400707889
01/07/2015
Open hole resistivity and gamma logs shall be run to describe the stratigraphy of the entire well bore and to adequately verify the setting depth of surface casing and aquifer coverage. On a multi-well pad, these open hole logs are only required on one of the first wells drilled on the pad and the Drilling Completion Report - Form 5 for every well on the pad shall identify which well was logged.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
General HousekeepingForm: (02 )
400707889
1/24/2015
• Prohibit Encana employees and contractors from carrying projectile weapons on Encana property, except during company organized events. • Prohibit pets on Encana property. • Strategically apply fugitive dust control measures, including enforce established speed limits on Encana private roads, to reduce fugitive dust and coating of vegetation and deposition in water sources.
WildlifeForm: (02 )
400707889
1/24/2015
• Perform biological surveys (on-site) for each new development, using the most recent data sets for wildlife and wetland resources. • Perform pre-disturbance surveys when the on-site inspection and commencement of disturbance occur in different field seasons using the most recent data sets for wildlife and wetland resources. • Utilize the Encana Wildlife Resources Matrix to identify and document (where appropriate) potential impacts or concerns during the project planning phase for proposed drilling operations and construction of roads, pads and pipelines. • Minimize the number, length and footprint of oil & gas development roads • Use existing access routes where possible • Combine utility infrastructure planning (gas, electric & water) when possible with roadway planning to avoid separate utility corridors • Reduce visits to well-sites through remote monitoring when practical (i.e. SCADA). Maximize use of state-of-the-art drilling technology (e.g., high efficiency rigs, coiledtubing unit rigs, closed-loop or pitless drilling, etc.) to minimize disturbance.
ConstructionForm: (02 )
400707889
1/24/2015
At this location, the following construction best management practices will apply: • Wattles • Topsoil Windrows (Diversion & ROPs) • Phased Construction • Run-on Protection • Erosion Control Mulch • Seeding • Stabilized unpaved surface • Rip Rap/ECB • Use multiple gathering lines placed in a single trench to minimize disturbance and construction, where appropriate, economically and technically feasible. • Install pipeline crossings at right angles to the drainages, wetlands, and perennial water bodies, where appropriate, economically and technically feasible. • Maintain a minimum of five feet of soil cover between the pipeline and the lowest point of the drainage or water body channel.